Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/89195
PIRA download icon_1.1View/Download Full Text
Title: Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas
Authors: Wuni, IY 
Shen, GQ 
Issue Date: 2020
Source: Built environment project and asset management, 2020, v. 10, no. 3, p. 407-421
Abstract: Purpose: Prefabricated prefinished volumetric construction (PPVC) projects are industrialized building systems that are co-created. Thus, effective management of the involved stakeholders is required to ensure project success. However, knowledge of how best to manage the diverse stakeholders in PPVC projects is limited. This research identified and prioritized the success factors or key result areas (KRAs) for the effective stakeholder management (SM) in PPVC projects.
Design/methodology/approach: A quantitative research design was implemented involving a literature review and structured questionnaire survey with international PPVC experts. The research identified and statistically analysed 12 KRAs for SM in PPVC projects. Findings: Analysis showed that the top three KRAs for SM in PPVC projects include: effective working collaboration, communication and information sharing among participants; effective coordination of the PPVC supply chain segments; and early involvement of relevant stakeholders in the PPVC project. A factor analysis clustered the 12 KRAs into stakeholder analysis and early involvement, effective communication and information sharing and stakeholder interest integration and conflict management.
Practical implications: The paper identified and prioritized the KRAs required for the effective SM in PPVC projects. To practitioners, the results may serve as decision support on the key areas to focus to ensure effective SM in PPVC projects and may guide the efficient allocation of limited resources.
Originality/value: This research constitutes the first exclusive attempt at identifying and benchmarking the generic KRAs required for effective SM in PPVC projects and contributes to the SM body of knowledge in industrialized construction.
Keywords: Benchmarking
Key result areas
Off-site manufacturing
Prefabricated prefinished volumetric construction
Project team
Stakeholder management
Publisher: Emerald Group Publishing Limited
Journal: Built environment project and asset management 
ISSN: 2044-124X
DOI: 10.1108/BEPAM-02-2020-0025
Rights: © Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher.
The following publication Wuni, I.Y. and Shen, G.Q. (2020), "Stakeholder management in prefabricated prefinished volumetric construction projects: benchmarking the key result areas", Built Environment Project and Asset Management, Vol. 10 No. 3, pp. 407-421 is published by Emerald and is available at https://dx.doi.org/10.1108/BEPAM-02-2020-0025
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Wuni_Management_Prefabricated_Prefinished.pdfPre-Published version1.06 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

82
Last Week
1
Last month
Citations as of Apr 14, 2024

Downloads

113
Citations as of Apr 14, 2024

SCOPUSTM   
Citations

23
Citations as of Apr 12, 2024

WEB OF SCIENCETM
Citations

20
Citations as of Apr 18, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.