Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/28419
Title: An EPQ model for deteriorating production system and items with rework
Authors: Li, N
Chan, FTS 
Chung, SH
Tai, AH
Issue Date: 2015
Publisher: Hindawi Publishing Corporation
Source: Mathematical problems in engineering, 2015, 957970 How to cite?
Journal: Mathematical problems in engineering 
Abstract: This paper investigates the economic production quantity model jointly considering product deterioration and a deteriorating production system with rework. In this imperfect deteriorating production system, not only does the machine produce defective product but also the machine is subjected to quality deterioration. To be more specific, the defective rate increases at certain time intervals. The defects produced are stored until the end of normal production process. Then they are reworked with extra cost to restore their quality and regarded as perfect product. The main objective is to minimize the total cost per unit product by determining the optimal combination of production run time and backlog quantity. Numerical experiments are carried out to illustrate the behavior of the inventory and show the impact of different parameters on the model. Discussion and conclusions are made at the end of the paper.
URI: http://hdl.handle.net/10397/28419
ISSN: 1024-123X
EISSN: 1563-5147
DOI: 10.1155/2015/957970
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

3
Last Week
0
Last month
0
Citations as of Jul 28, 2017

WEB OF SCIENCETM
Citations

2
Last Week
0
Last month
0
Citations as of Aug 15, 2017

Page view(s)

42
Last Week
1
Last month
Checked on Aug 14, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.