Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/28419
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Applied Mathematics-
dc.contributorDepartment of Industrial and Systems Engineering-
dc.creatorLi, N-
dc.creatorChan, FTS-
dc.creatorChung, SH-
dc.creatorTai, AH-
dc.date.accessioned2015-07-13T10:34:38Z-
dc.date.available2015-07-13T10:34:38Z-
dc.identifier.issn1024-123Xen_US
dc.identifier.urihttp://hdl.handle.net/10397/28419-
dc.language.isoenen_US
dc.publisherHindawi Publishing Corporationen_US
dc.rightsCopyright © 2015 N. Li et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.en_US
dc.rightsThe following article: Li, N., Chan, F. T., Chung, S. H., & Tai, A. H. (2015). An EPQ model for deteriorating production system and items with rework. Mathematical Problems in Engineering, 2015, is available at https//doi.org/10.1155/2015/957970en_US
dc.titleAn EPQ model for deteriorating production system and items with reworken_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.volume2015en_US
dc.identifier.doi10.1155/2015/957970en_US
dcterms.abstractThis paper investigates the economic production quantity model jointly considering product deterioration and a deteriorating production system with rework. In this imperfect deteriorating production system, not only does the machine produce defective product but also the machine is subjected to quality deterioration. To be more specific, the defective rate increases at certain time intervals. The defects produced are stored until the end of normal production process. Then they are reworked with extra cost to restore their quality and regarded as perfect product. The main objective is to minimize the total cost per unit product by determining the optimal combination of production run time and backlog quantity. Numerical experiments are carried out to illustrate the behavior of the inventory and show the impact of different parameters on the model. Discussion and conclusions are made at the end of the paper.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationMathematical problems in engineering, 2015, 957970-
dcterms.isPartOfMathematical problems in engineering-
dcterms.issued2015-
dc.identifier.scopus2-s2.0-84924588897-
dc.identifier.eissn1563-5147en_US
dc.identifier.rosgroupid2015000903-
dc.description.ros2015-2016 > Academic research: refereed > Publication in refereed journalen_US
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
Li_An_EPQ_Model.pdf2.74 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

109
Last Week
1
Last month
Citations as of Apr 14, 2024

Downloads

157
Citations as of Apr 14, 2024

SCOPUSTM   
Citations

22
Last Week
1
Last month
0
Citations as of Apr 19, 2024

WEB OF SCIENCETM
Citations

17
Last Week
0
Last month
0
Citations as of Apr 18, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.