Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/97510
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorAbdelkader, EMen_US
dc.creatorMoselhi, Oen_US
dc.creatorMarzouk, Men_US
dc.creatorZayed, Ten_US
dc.date.accessioned2023-03-06T01:19:43Z-
dc.date.available2023-03-06T01:19:43Z-
dc.identifier.issn0733-9364en_US
dc.identifier.urihttp://hdl.handle.net/10397/97510-
dc.language.isoenen_US
dc.publisherAmerican Society of Civil Engineersen_US
dc.rights© 2021 American Society of Civil Engineersen_US
dc.rightsThis material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/(ASCE)CO.1943-7862.0002113.en_US
dc.subjectBridge deck replacementen_US
dc.subjectDiscrete event simulationen_US
dc.subjectElman neural networken_US
dc.subjectInvasive-weed optimizationen_US
dc.subjectMultiobjective differential evolution optimizationen_US
dc.subjectSurrogate machine learningen_US
dc.titleIntegrative evolutionary-based method for modeling and optimizing budget assignment of bridge maintenance prioritiesen_US
dc.typeJournal/Magazine Articleen_US
dc.description.otherinformationTitle on author’s file: An Integrative Evolutionary-based Method for Modeling and Optimizing Budget Assignment of Bridge Maintenance Prioritiesen_US
dc.identifier.volume147en_US
dc.identifier.issue9en_US
dc.identifier.doi10.1061/(ASCE)CO.1943-7862.0002113en_US
dcterms.abstractRecently, the number of deteriorating bridges has drastically increased. As such, enormous amounts of resources are invested yearly to maintain the performance of bridges within acceptable levels. This entails the development of bridge management systems to manage the imbalance between the extensive needs for maintenance, repair and rehabilitation actions, and the limited available funds. In this regard, the present study introduces a three-tier platform to model and allocate limited resources in maintenance projects. The first model involves building a discrete event simulation model to mimic the bridge deck replacement process. The second encompasses structuring an efficient and straightforward surrogate machine learning model for mimicking the computationally expensive discrete event simulation model. In the second phase, a novel hybrid Elman neural-network invasive-weed optimization model is developed for predicting the time, cost, greenhouse gases, and utilization rates of resource allocation plans using a database generated from the previous model. The third constitutes the formulation of a multiobjective differential evolution optimization model subject to the utilization rates of the involved resources and their dispersion. Results manifest superiority in cost prediction accuracies, achieving a mean absolute percentage error, mean absolute error, and root-mean-squared error of 4.873%, 78.466%, and 39.515%, respectively. Additionally, the developed multiobjective optimization model significantly outperformed a set of well-performing metaheuristics, yielding a hypervolume indicator, generational distance, spacing, diversity, spread, and coverage of 81.721%, 0.029%, 0.1881%, 0.5229%, 0.9618%, and 0.4087%, respectively. The results also demonstrate the developed multiobjective optimization model accomplished an improvement in the minimization time, cost, and greenhouse gases by 71.01%, 27.87%, and 39.29%, respectively, when compared against a genetic algorithm. The developed models are automated through the hybrid programming of C#.net and MATLAB. It is expected that the developed method can enable the practitioners and transportation agencies to establish timely-efficient, cost-effective, and sustainable resource allocation plans while accommodating the efficacious utilization of resources.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationJournal of construction engineering and management, Sept. 2021, v. 147, no. 9, 4021100en_US
dcterms.isPartOfJournal of construction engineering and managementen_US
dcterms.issued2021-09-
dc.identifier.scopus2-s2.0-85108988780-
dc.identifier.eissn1943-7862en_US
dc.identifier.artn4021100en_US
dc.description.validate202303 bcww-
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumberBRE-0042-
dc.description.fundingSourceSelf-fundeden_US
dc.description.pubStatusPublisheden_US
dc.identifier.OPUS54511559-
dc.description.oaCategoryGreen (AAM)en_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
Zayed_Integrative_Evolutionary-Based_Method.pdfPre-Published version4.52 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

115
Last Week
2
Last month
Citations as of Nov 30, 2025

Downloads

162
Citations as of Nov 30, 2025

SCOPUSTM   
Citations

12
Citations as of Dec 19, 2025

WEB OF SCIENCETM
Citations

10
Citations as of Dec 18, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.