Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/89194
PIRA download icon_1.1View/Download Full Text
Title: Quantitative evaluation and ranking of the critical success factors for modular integrated construction projects
Authors: Wuni, IY 
Shen, GQ 
Osei-Kyei, R
Issue Date: 2022
Source: International journal of construction management, 2022, v. 22, no. 11, p. 2108-2120
Abstract: Modular integrated construction (MiC) is becoming a preferred construction approach for many types of building projects. However, several factors and conditions must converge to determine the success of MiC projects. This research identified and evaluated 25 critical success factors (CSFs) for implementing MiC projects. The dataset was generated through a structured questionnaire survey and analyzed using robust statistical techniques. Based on the mean scores, the top five CSFs for MiC projects include fabricator experience and capabilities in modules design and production; robust drawing specifications and early design freeze; good working collaboration, communication and information sharing among project participants; standardization and mass production; and effective coordination of the supply chain segments. An exploratory factor analysis generated four principal success factors (PSFs), comprising adequate technical capability and infrastructure; effective stakeholder and supply chain management; early commitment; and standardization and benchmarking. A fuzzy evaluation revealed that all the four PSFs are paramount to the success of MiC projects. As a contribution, the research has identified and prioritized the CSFs which may help MiC project managers and stakeholders in the appropriate allocation of limited resources. These shared CSFs may constitute forecasting and diagnostic tools for progressively measuring success along the MiC project lifecycle phases.
Keywords: Critical success factors
Fuzzy synthetic modelling
Modular integrated construction
Off-site manufacturing
Publisher: Taylor & Francis
Journal: International journal of construction management 
ISSN: 1562-3599
EISSN: 2331-2327
DOI: 10.1080/15623599.2020.1766190
Rights: © 2020 Informa UK Limited, trading as Taylor & Francis Group
This is an Accepted Manuscript of an article published by Taylor & Francis in International journal of construction management on uploaded file (Published online), available online: http://www.tandfonline.com/10.1080/15623599.2020.1766190.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
a0547-n05.pdfPre-Published version994.74 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

95
Last Week
0
Last month
Citations as of Apr 21, 2024

Downloads

131
Citations as of Apr 21, 2024

SCOPUSTM   
Citations

19
Citations as of Apr 19, 2024

WEB OF SCIENCETM
Citations

19
Citations as of Apr 25, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.