Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/88004
| Title: | A navigation and positioning-integrated system for construction quality inspection under self-discipline of responsible personnel | Authors: | Xing, X Zhong, B Luo, H |
Issue Date: | 2019 | Source: | Proceedings of the CIB World Building Congress 2019 : Constructing Smart Cities, the Hong Kong Polytechnic University, Hong Kong, 17-21 June, 2019, p. [387-396] (online version) | Abstract: | Construction quality control is one of the major factors that ensure a project completed within budget and schedule. However, the quality inspection and management (QIM) process is usually inefficient and invalid, due to the scattered construction codes, the overlooked process monitoring, the complex data entry process, and especially the weak sense of responsibility. To address above issues, this paper proposes a UWB (Ultra-Wideband)-based Quality Inspection and Management System (UWB-QIMS). By integrating the application of BIM (Building Information Modeling), UWB and PDA (Personal Digital Assistant), navigation and indoor positioning for inspectors can be realized. Thus the UWBQIMS can promote the effective construction QIM under self-discipline of responsible personnel, which benefits mainly in two ways: 1) assisting the site work of inspectors by pushing navigation paths and checklists through a PDA, and then guiding inspectors to work on site effectively; 2) assisting the supervision and decision making of managers by tracing the inspection coordinates in BIM environment, and supporting to supervise the inspector’s working condition and issue timely warnings. Finally, the prototype system was tested and evaluated in a quality inspection scene, aiming at the construction phase of a residential building. The testing results illustrated the effectiveness of the UWBQIMS in supporting effective QIM focusing on the sense of responsibility of responsible personnel. Besides, the potential applicability of integrating BIM, UWB, and PDA in construction quality control was proved. | Keywords: | Construction quality inspection and management Sense of responsibility BIM UWB |
ISBN: | 978-962-367-821-6 | Rights: | Posted with permission. |
| Appears in Collections: | Conference Paper |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Xing_Navigation_Positioning-Integrated_System.pdf | 985.55 kB | Adobe PDF | View/Open |
Page views
150
Last Week
1
1
Last month
Citations as of Nov 10, 2025
Downloads
73
Citations as of Nov 10, 2025
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



