Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/88004
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorXing, X-
dc.creatorZhong, B-
dc.creatorLuo, H-
dc.date.accessioned2020-09-09T00:54:39Z-
dc.date.available2020-09-09T00:54:39Z-
dc.identifier.isbn978-962-367-821-6-
dc.identifier.urihttp://hdl.handle.net/10397/88004-
dc.language.isoenen_US
dc.rightsPosted with permission.en_US
dc.subjectConstruction quality inspection and managementen_US
dc.subjectSense of responsibilityen_US
dc.subjectBIMen_US
dc.subjectUWBen_US
dc.titleA navigation and positioning-integrated system for construction quality inspection under self-discipline of responsible personnelen_US
dc.typeConference Paperen_US
dc.identifier.spage387-
dc.identifier.epage396-
dcterms.abstractConstruction quality control is one of the major factors that ensure a project completed within budget and schedule. However, the quality inspection and management (QIM) process is usually inefficient and invalid, due to the scattered construction codes, the overlooked process monitoring, the complex data entry process, and especially the weak sense of responsibility. To address above issues, this paper proposes a UWB (Ultra-Wideband)-based Quality Inspection and Management System (UWB-QIMS). By integrating the application of BIM (Building Information Modeling), UWB and PDA (Personal Digital Assistant), navigation and indoor positioning for inspectors can be realized. Thus the UWBQIMS can promote the effective construction QIM under self-discipline of responsible personnel, which benefits mainly in two ways: 1) assisting the site work of inspectors by pushing navigation paths and checklists through a PDA, and then guiding inspectors to work on site effectively; 2) assisting the supervision and decision making of managers by tracing the inspection coordinates in BIM environment, and supporting to supervise the inspector’s working condition and issue timely warnings. Finally, the prototype system was tested and evaluated in a quality inspection scene, aiming at the construction phase of a residential building. The testing results illustrated the effectiveness of the UWBQIMS in supporting effective QIM focusing on the sense of responsibility of responsible personnel. Besides, the potential applicability of integrating BIM, UWB, and PDA in construction quality control was proved.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationProceedings of the CIB World Building Congress 2019 : Constructing Smart Cities, the Hong Kong Polytechnic University, Hong Kong, 17-21 June, 2019, p. [387-396] (online version)-
dcterms.issued2019-
dc.relation.conferenceCIB World Building Congress-
dc.description.validate202009 bcrc-
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_Othersen_US
dc.description.pubStatusPublisheden_US
dc.description.oaCategoryPublisher permissionen_US
Appears in Collections:Conference Paper
Files in This Item:
File Description SizeFormat 
Xing_Navigation_Positioning-Integrated_System.pdf985.55 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

172
Last Week
1
Last month
Citations as of Feb 9, 2026

Downloads

86
Citations as of Feb 9, 2026

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.