Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/17136
| DC Field | Value | Language |
|---|---|---|
| dc.contributor | Department of Logistics and Maritime Studies | - |
| dc.creator | Cheng, TCE | - |
| dc.creator | Tseng, SC | - |
| dc.creator | Lai, PJ | - |
| dc.creator | Lee, WC | - |
| dc.date.accessioned | 2014-12-19T06:56:42Z | - |
| dc.date.available | 2014-12-19T06:56:42Z | - |
| dc.identifier.issn | 1024-123X | en_US |
| dc.identifier.uri | http://hdl.handle.net/10397/17136 | - |
| dc.language.iso | en | en_US |
| dc.publisher | Hindawi Publishing Corporation | en_US |
| dc.rights | Copyright © 2013 T. C. E. Cheng et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. | en_US |
| dc.rights | The following article: T. C. E. Cheng, Shih-Chang Tseng, Peng-Jen Lai, and Wen-Chiung Lee, “Single-Machine Scheduling with Accelerating Learning Effects,” Mathematical Problems in Engineering, 816235, 2013, is available at https://doi.org/10.1155/2013/816235 | en_US |
| dc.title | Single-machine scheduling with accelerating learning effects | en_US |
| dc.type | Journal/Magazine Article | en_US |
| dc.identifier.volume | 2013 | en_US |
| dc.identifier.doi | 10.1155/2013/816235 | en_US |
| dcterms.abstract | Scheduling with learning effects has been widely studied. However, there are situations where the learning effect might accelerate. In this paper, we propose a new model where the learning effect accelerates as time goes by. We derive the optimal solutions for the single-machine problems to minimize the makespan, total completion time, total weighted completion time, maximum lateness, maximum tardiness, and total tardiness. | - |
| dcterms.accessRights | open access | en_US |
| dcterms.bibliographicCitation | Mathematical problems in engineering, 2013, v. 2013, 816235 | - |
| dcterms.isPartOf | Mathematical problems in engineering | - |
| dcterms.issued | 2013 | - |
| dc.identifier.scopus | 2-s2.0-84890080924 | - |
| dc.identifier.eissn | 1563-5147 | en_US |
| dc.identifier.rosgroupid | r68416 | - |
| dc.description.ros | 2013-2014 > Academic research: refereed > Publication in refereed journal | en_US |
| dc.description.oa | Version of Record | en_US |
| dc.identifier.FolderNumber | OA_IR/PIRA | en_US |
| dc.description.pubStatus | Published | en_US |
| dc.description.oaCategory | CC | en_US |
| Appears in Collections: | Journal/Magazine Article | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Cheng_Single-machine_scheduling.pdf | 1.91 MB | Adobe PDF | View/Open |
Page views
203
Last Week
8
8
Last month
Citations as of Nov 9, 2025
Downloads
143
Citations as of Nov 9, 2025
SCOPUSTM
Citations
1
Last Week
0
0
Last month
0
0
Citations as of Nov 28, 2025
WEB OF SCIENCETM
Citations
1
Last Week
0
0
Last month
0
0
Citations as of Nov 27, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



