| Title: | Dynamic framework transfer model for public–private partnerships : lessons from a China water sector case study | Authors: | Bao, F Chen, C Chan, APC Martek, I Shrestha, A |
Issue Date: | 2-Aug-2019 | Source: | Engineering, construction and architectural management, 2 Aug. 2019, v. 26, no.7, p. 1218-1239 | Abstract: | Purpose: Public–private partnerships (PPPs) have emerged in developing countries, such as China, as a ubiquitous means by which government procures needed infrastructure. In this regard, they have been much studied. However, due to their long concession period, running into decades, few have run their full course into the transfer phase (TP) in which the PPP concession reverts from the private entity back to the public. In China, this is about to change as many PPPs approach their TP. Hence, the purpose of this paper is to comprehensively investigate the TP of PPPs in China. Design/methodology/approach: A three-part methodology was undertaken to achieve the research purpose. Extensive literature review was first conducted to analyze the status quo of the transfer management regime in China, followed by the identification of critical challenges and the exploration of solutions via studying the TP of the Chengdu No. 6 Water Plant B Project – the first PPP in China’s water sector to reach the TP. Research procedures and outcomes were hierarchically visualized by using Integration DEFinition language 0 (IDEF0) method. Findings: The current transfer management regime of PPPs in China’s water sector is deficient in many aspects. Based on the insight into the practice, a generic transfer process model with hierarchical structure process and sub-processes serving as a dynamic framework transfer model with self-evolving nature is developed to facilitate the successful transfer of the PPP utility. Originality/value: To the authors’ best knowledge, this is the first attempt to systematically probe the TP of PPPs. Hopefully, the findings of this paper are to instruct government and PPP practitioners alike on mechanisms for smoothing the TP of further PPP projects ending their concession period. |
Keywords: | Case study China Dynamic framework transfer IDEF0 Novel model Process Process model Project management Public–private partnership Transfer phase Water sector |
Publisher: | Emerald Publishing Limited | Journal: | Engineering, construction and architectural management | ISSN: | 0969-9988 | EISSN: | 1365-232X | DOI: | 10.1108/ECAM-01-2018-0028 | Rights: | © Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher. The following publication Bao, F., Chen, C., Chan, A.P.C., Martek, I. and Shrestha, A. (2019), "Dynamic framework transfer model for public–private partnerships: Lessons from a China water sector case study", Engineering, Construction and Architectural Management, Vol. 26 No. 7, pp. 1218-1239 is published by Emerald and is available at https://doi.org/10.1108/ECAM-01-2018-0028. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Bao_Dynamic_Framework_Transfer.pdf | Pre-Published version | 1.78 MB | Adobe PDF | View/Open |
Page views
113
Last Week
4
4
Last month
Citations as of Nov 30, 2025
Downloads
160
Citations as of Nov 30, 2025
SCOPUSTM
Citations
15
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
14
Citations as of Dec 18, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.