Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/103316
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorBao, Fen_US
dc.creatorChen, Cen_US
dc.creatorChan, APCen_US
dc.creatorMartek, Ien_US
dc.creatorShrestha, Aen_US
dc.date.accessioned2023-12-11T00:33:06Z-
dc.date.available2023-12-11T00:33:06Z-
dc.identifier.issn0969-9988en_US
dc.identifier.urihttp://hdl.handle.net/10397/103316-
dc.language.isoenen_US
dc.publisherEmerald Publishing Limiteden_US
dc.rights© Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher.en_US
dc.rightsThe following publication Bao, F., Chen, C., Chan, A.P.C., Martek, I. and Shrestha, A. (2019), "Dynamic framework transfer model for public–private partnerships: Lessons from a China water sector case study", Engineering, Construction and Architectural Management, Vol. 26 No. 7, pp. 1218-1239 is published by Emerald and is available at https://doi.org/10.1108/ECAM-01-2018-0028.en_US
dc.subjectCase studyen_US
dc.subjectChinaen_US
dc.subjectDynamic framework transferen_US
dc.subjectIDEF0en_US
dc.subjectNovel modelen_US
dc.subjectProcessen_US
dc.subjectProcess modelen_US
dc.subjectProject managementen_US
dc.subjectPublic–private partnershipen_US
dc.subjectTransfer phaseen_US
dc.subjectWater sectoren_US
dc.titleDynamic framework transfer model for public–private partnerships : lessons from a China water sector case studyen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage1218en_US
dc.identifier.epage1239en_US
dc.identifier.volume26en_US
dc.identifier.issue7en_US
dc.identifier.doi10.1108/ECAM-01-2018-0028en_US
dcterms.abstractPurpose: Public–private partnerships (PPPs) have emerged in developing countries, such as China, as a ubiquitous means by which government procures needed infrastructure. In this regard, they have been much studied. However, due to their long concession period, running into decades, few have run their full course into the transfer phase (TP) in which the PPP concession reverts from the private entity back to the public. In China, this is about to change as many PPPs approach their TP. Hence, the purpose of this paper is to comprehensively investigate the TP of PPPs in China.-
dcterms.abstractDesign/methodology/approach: A three-part methodology was undertaken to achieve the research purpose. Extensive literature review was first conducted to analyze the status quo of the transfer management regime in China, followed by the identification of critical challenges and the exploration of solutions via studying the TP of the Chengdu No. 6 Water Plant B Project – the first PPP in China’s water sector to reach the TP. Research procedures and outcomes were hierarchically visualized by using Integration DEFinition language 0 (IDEF0) method.-
dcterms.abstractFindings: The current transfer management regime of PPPs in China’s water sector is deficient in many aspects. Based on the insight into the practice, a generic transfer process model with hierarchical structure process and sub-processes serving as a dynamic framework transfer model with self-evolving nature is developed to facilitate the successful transfer of the PPP utility.-
dcterms.abstractOriginality/value: To the authors’ best knowledge, this is the first attempt to systematically probe the TP of PPPs. Hopefully, the findings of this paper are to instruct government and PPP practitioners alike on mechanisms for smoothing the TP of further PPP projects ending their concession period.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationEngineering, construction and architectural management, 2 Aug. 2019, v. 26, no.7, p. 1218-1239en_US
dcterms.isPartOfEngineering, construction and architectural managementen_US
dcterms.issued2019-08-02-
dc.identifier.scopus2-s2.0-85063863619-
dc.identifier.eissn1365-232Xen_US
dc.description.validate202312 bcch-
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumberBRE-0537-
dc.description.fundingSourceRGCen_US
dc.description.pubStatusPublisheden_US
dc.identifier.OPUS20900814-
dc.description.oaCategoryGreen (AAM)en_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
Bao_Dynamic_Framework_Transfer.pdfPre-Published version1.78 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

113
Last Week
4
Last month
Citations as of Nov 30, 2025

Downloads

160
Citations as of Nov 30, 2025

SCOPUSTM   
Citations

15
Citations as of Dec 19, 2025

WEB OF SCIENCETM
Citations

14
Citations as of Dec 18, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.