Title: Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population
Authors: Sang, J
Li, ZC
Lam, WHK 
Wong, SC
Issue Date: Dec-2019
Source: Transportation research. Part B, Methodological, Dec. 2019, v. 130, p. 36-66
Abstract: This paper proposes a novel model of the design of a build-operate-transfer (BOT) contract for integrated rail and property (R + P) development when the size of future urban population is uncertain. A real-option approach is adopted to accurately capture the potential economic value of a BOT investment project under uncertainty and its externality effects on urban spatial structure. The proposed model is formulated as a two-stage problem. The first stage of the model optimizes the concession period and rail line parameters (including rail line length, and number and locations of stations) through a Nash bargaining game between a private investor and the government. The second stage determines the headways and fares during the private operation and after transferring the BOT project to the government. The private investor's objective is to maximize its own net profit received during the concession period, whereas the government aims to maximize social welfare over the whole life-cycle of the project. The proposed model is extended to explore the effects of future population jumps due to non-recurrent random events and station deployments with even and uneven station spacings. The results show that compared with the rail-only scheme, the R + P scheme can lead to a win-win situation for the government and private investor. In the BOT contract design, ignoring the effects of population jumps and using an average (or even) station spacing as an estimate of actual station deployment can cause a large bias of the parameter values designed in the contract and an underestimate of project values in terms of expected net profit and expected social welfare.
Keywords: BOT contract
Integrated rail and property development
Nash bargaining game
Poisson jump
Population uncertainty
Real options
Publisher: Pergamon Press
Journal: Transportation research. Part B, Methodological 
ISSN: 0191-2615
EISSN: 1879-2367
DOI: 10.1016/j.trb.2019.10.003
Rights: © 2019 Elsevier Ltd. All rights reserved.
© 2019. This manuscript version is made available under the CC-BY-NC-ND 4.0 license https://creativecommons.org/licenses/by-nc-nd/4.0/
The following publication Sang, J., Li, Z. C., Lam, W. H., & Wong, S. C. (2019). Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population. Transportation Research Part B: Methodological, 130, 36-66 is available at https://doi.org/10.1016/j.trb.2019.10.003.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Lam_Design_Build-Operate-Transfer_Contract.pdfPre-Published version2.89 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

84
Citations as of Jun 22, 2025

Downloads

61
Citations as of Jun 22, 2025

SCOPUSTM   
Citations

14
Citations as of Jul 3, 2025

WEB OF SCIENCETM
Citations

10
Citations as of Jun 5, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.