Title: Resource budget for workface planning in industrial-construction
Authors: Siu, MFF 
Issue Date: 2019
Source: Facilities, 2019, v. 37, no. 5/6, p. 292-312
Abstract: Purpose: The purpose of this paper is to develop a novel analytical approach for workface planning practice in industrial-construction sector such that the construction work package (CWP) resource budget can be sufficiently planned for delivering possible field installation work package (FIWP) schedules with work uncertainty.
Design/methodology/approach: The relationship between CWP resource budget and FIWP schedules is first elucidated based on workface planning practice. The literature of work packaging, workface planning and project scheduling is reviewed. A novel analytical approach is then developed to quantify CWP resource budget based on a probability theory, in consideration of the probability of occurrence of feasible FIWP schedules formulated based on a resource scheduling approach. The results of case studies given by the new approach are cross validated by using simulation and optimization techniques.
Findings: The new analytical approach can assist workface planning by quantifying the expected CWP resource budget to deliver the FIWP work scope with certain activities that are planned at project level and with uncertain activities that are found at workface level.
Practical implications: The new analytical approach helps project and workface planners to reliably deploy CWP resource budget for delivering FIWP schedules instead of guessing the budget based on experience. An industrial-construction project for upgrading oil-sands refinery facility is used to show the practical implications.
Originality/value: This research develops a new analytical approach for workface planning practice to determine sufficient CWP resource budget for delivering feasible FIWP schedules with work uncertainty.
Keywords: Industrial-construction
Oil-sands facility
Resource budgeting
Resource scheduling
Publisher: Emerald Group Publishing Limited
Journal: Facilities 
ISSN: 0263-2772
EISSN: 1758-7131
DOI: 10.1108/F-04-2018-0057
Rights: © Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher.
The following publication Siu, M.F.F. (2019), "Resource budget for workface planning in industrial-construction", Facilities, Vol. 37 No. 5/6, pp. 292-312 is published by Emerald and is available at https://dx.doi.org/10.1108/F-04-2018-0057
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
BRE-0607_Siu_Resource_Budget_Workface.pdfPre-Published version572.01 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

52
Last Week
1
Last month
Citations as of May 5, 2024

Downloads

62
Citations as of May 5, 2024

SCOPUSTM   
Citations

6
Citations as of Apr 26, 2024

WEB OF SCIENCETM
Citations

1
Citations as of Feb 29, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.