Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/94126
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estateen_US
dc.creatorSiu, MFFen_US
dc.date.accessioned2022-08-11T01:07:16Z-
dc.date.available2022-08-11T01:07:16Z-
dc.identifier.issn0263-2772en_US
dc.identifier.urihttp://hdl.handle.net/10397/94126-
dc.language.isoenen_US
dc.publisherEmerald Group Publishing Limiteden_US
dc.rights© Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher.en_US
dc.rightsThe following publication Siu, M.F.F. (2019), "Resource budget for workface planning in industrial-construction", Facilities, Vol. 37 No. 5/6, pp. 292-312 is published by Emerald and is available at https://dx.doi.org/10.1108/F-04-2018-0057en_US
dc.subjectIndustrial-constructionen_US
dc.subjectOil-sands facilityen_US
dc.subjectResource budgetingen_US
dc.subjectResource schedulingen_US
dc.titleResource budget for workface planning in industrial-constructionen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage292en_US
dc.identifier.epage312en_US
dc.identifier.volume37en_US
dc.identifier.issue5/6en_US
dc.identifier.doi10.1108/F-04-2018-0057en_US
dcterms.abstractPurpose: The purpose of this paper is to develop a novel analytical approach for workface planning practice in industrial-construction sector such that the construction work package (CWP) resource budget can be sufficiently planned for delivering possible field installation work package (FIWP) schedules with work uncertainty.en_US
dcterms.abstractDesign/methodology/approach: The relationship between CWP resource budget and FIWP schedules is first elucidated based on workface planning practice. The literature of work packaging, workface planning and project scheduling is reviewed. A novel analytical approach is then developed to quantify CWP resource budget based on a probability theory, in consideration of the probability of occurrence of feasible FIWP schedules formulated based on a resource scheduling approach. The results of case studies given by the new approach are cross validated by using simulation and optimization techniques.en_US
dcterms.abstractFindings: The new analytical approach can assist workface planning by quantifying the expected CWP resource budget to deliver the FIWP work scope with certain activities that are planned at project level and with uncertain activities that are found at workface level.en_US
dcterms.abstractPractical implications: The new analytical approach helps project and workface planners to reliably deploy CWP resource budget for delivering FIWP schedules instead of guessing the budget based on experience. An industrial-construction project for upgrading oil-sands refinery facility is used to show the practical implications.en_US
dcterms.abstractOriginality/value: This research develops a new analytical approach for workface planning practice to determine sufficient CWP resource budget for delivering feasible FIWP schedules with work uncertainty.en_US
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationFacilities, 2019, v. 37, no. 5/6, p. 292-312en_US
dcterms.isPartOfFacilitiesen_US
dcterms.issued2019-
dc.identifier.scopus2-s2.0-85062145323-
dc.identifier.eissn1758-7131en_US
dc.description.validate202208 bcchen_US
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumbera1603-
dc.identifier.SubFormID45583, BRE-0607-
dc.description.fundingSourceSelf-fundeden_US
dc.description.pubStatusPublisheden_US
dc.identifier.OPUS25285077-
dc.description.oaCategoryGreen (AAM)en_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
BRE-0607_Siu_Resource_Budget_Workface.pdfPre-Published version572.01 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

53
Last Week
1
Last month
Citations as of May 12, 2024

Downloads

62
Citations as of May 12, 2024

SCOPUSTM   
Citations

6
Citations as of May 17, 2024

WEB OF SCIENCETM
Citations

1
Citations as of Feb 29, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.