Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/89797
| Title: | Multistage stochastic power generation scheduling co-optimizing energy and ancillary services | Authors: | Huang, J Pan, K Guan, Y |
Issue Date: | 2021 | Source: | INFORMS journal on computing, Winter 2021, v. 33, no. 1, p. 352-369 | Abstract: | With the increasing penetration of intermittent renewable energy and fluctuating electricity loads, power system operators are facing significant challenges in maintaining system load balance and reliability. In addition to traditional energy markets that are designed to balance power generation and load, ancillary service markets have been recently introduced to help manage the considerable uncertainty by reserving certain generation capacities against unexpected events. In this paper, we develop a multistage stochastic optimization model for system operators to efficiently schedule power-generation assets to co-optimize power generation and regulation reserve service (a critical ancillary service product) under uncertainty. In addition, to improve the computational efficiency of the proposed multistage stochastic integer program, we explore its polyhedral structure by investigating physical characteristics of individual generators, the system-wide requirements that couple all of the generators, and the scenario tree structure for our proposed multistage model. We start with the single-generator polytope and provide convex hull descriptions for the two-period case under different parameter settings. We then provide several families ofmultiperiod strong valid inequalities linking different scenarios and covering decision variables that represent both power generation and regulation reserve amounts. We further extend our study by exploring the multigenerator polytope and derive strong valid inequalities linking different generators and covering multiple periods. To enhance computational performance, polynomial-time separation algorithms are developed for the exponential number of inequalities. Finally, we verify the effectiveness of our proposed strong valid inequalities by applying them as user cuts under the branch-and-cut scheme to solve multistage stochastic network-constrained power generation scheduling problems. | Keywords: | Ancillary services Convex hull Power generation scheduling Stochastic optimization Strong valid inequalities |
Publisher: | INFORMS | Journal: | Informs journal on computing | ISSN: | 1091-9856 | EISSN: | 1526-5528 | DOI: | 10.1287/ijoc.2019.0933 | Rights: | © 2020, INFORMS This is an Author Accepted Manuscript of an article published by INFORMS. The final publication is available at https://doi.org/10.1287/ijoc.2019.0933 |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| a0791-n06_1691.pdf | Pre-Published version | 1.47 MB | Adobe PDF | View/Open |
Page views
88
Last Week
0
0
Last month
Citations as of Apr 14, 2025
Downloads
109
Citations as of Apr 14, 2025
SCOPUSTM
Citations
18
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
15
Citations as of Oct 10, 2024
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



