Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/89797
PIRA download icon_1.1View/Download Full Text
Title: Multistage stochastic power generation scheduling co-optimizing energy and ancillary services
Authors: Huang, J
Pan, K 
Guan, Y
Issue Date: 2021
Source: INFORMS journal on computing, Winter 2021, v. 33, no. 1, p. 352-369
Abstract: With the increasing penetration of intermittent renewable energy and fluctuating electricity loads, power system operators are facing significant challenges in maintaining system load balance and reliability. In addition to traditional energy markets that are designed to balance power generation and load, ancillary service markets have been recently introduced to help manage the considerable uncertainty by reserving certain generation capacities against unexpected events. In this paper, we develop a multistage stochastic optimization model for system operators to efficiently schedule power-generation assets to co-optimize power generation and regulation reserve service (a critical ancillary service product) under uncertainty. In addition, to improve the computational efficiency of the proposed multistage stochastic integer program, we explore its polyhedral structure by investigating physical characteristics of individual generators, the system-wide requirements that couple all of the generators, and the scenario tree structure for our proposed multistage model. We start with the single-generator polytope and provide convex hull descriptions for the two-period case under different parameter settings. We then provide several families ofmultiperiod strong valid inequalities linking different scenarios and covering decision variables that represent both power generation and regulation reserve amounts. We further extend our study by exploring the multigenerator polytope and derive strong valid inequalities linking different generators and covering multiple periods. To enhance computational performance, polynomial-time separation algorithms are developed for the exponential number of inequalities. Finally, we verify the effectiveness of our proposed strong valid inequalities by applying them as user cuts under the branch-and-cut scheme to solve multistage stochastic network-constrained power generation scheduling problems.
Keywords: Ancillary services
Convex hull
Power generation scheduling
Stochastic optimization
Strong valid inequalities
Publisher: INFORMS
Journal: Informs journal on computing 
ISSN: 1091-9856
EISSN: 1526-5528
DOI: 10.1287/ijoc.2019.0933
Rights: © 2020, INFORMS
This is an Author Accepted Manuscript of an article published by INFORMS. The final publication is available at https://doi.org/10.1287/ijoc.2019.0933
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
a0791-n06_1691.pdfPre-Published version1.47 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

46
Last Week
0
Last month
Citations as of Apr 28, 2024

Downloads

35
Citations as of Apr 28, 2024

SCOPUSTM   
Citations

11
Citations as of Apr 26, 2024

WEB OF SCIENCETM
Citations

12
Citations as of May 2, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.