Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/94777
Title: | Critical success factors for building information modelling (BIM) implementation in Hong Kong | Authors: | Chan, DWM Olawumi, TO Ho, AML |
Issue Date: | 2019 | Source: | Engineering, construction and architectural management, 2019, v. 26, no. 9, p. 1838-1854 | Abstract: | Purpose: Some initiatives have been proposed and implemented to facilitate successful project delivery and improve coordination and collaboration in the design, construction and management phases of project development. Building information modeling (BIM) is one of those initiatives that, though recent, however, have made a significant impact on the construction industry in some countries. The paper aims to discuss this issue. Design/methodology/approach: This paper aims to explore the critical success factors for BIM implementation in the architecture, engineering and construction industry of Hong Kong through a mixed research method (structured empirical questionnaire survey and expert interviews). Findings: The most influential success factor relates to the client’s acceptance with BIM projects, proper organizational structure to support a BIM system within the company and financial aid from the government to set up the BIM system. The expert interviewees also stressed the need for willingness from project staff members to learn and utilize BIM. Practical implications: This study has contributed to the establishment of more practical and effective strategies for ensuring full adoption of BIM in Hong Kong. Practical recommendations for enhancing BIM adoption in the construction industry were highlighted. Originality/value: This study has established the key drivers leading to the success of BIM implementation in Hong Kong, as well as in the perspective of construction experts on how to enhance its uptake in construction projects. |
Keywords: | Building information modelling Construction Technology |
Publisher: | Emerald Group Publishing Limited | Journal: | Engineering, construction and architectural management | ISSN: | 0969-9988 | EISSN: | 1365-232X | DOI: | 10.1108/ECAM-05-2018-0204 | Rights: | © Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher. The following publication Chan, D.W.M., Olawumi, T.O. and Ho, A.M.L. (2019), "Critical success factors for building information modelling (BIM) implementation in Hong Kong", Engineering, Construction and Architectural Management, Vol. 26 No. 9, pp. 1838-1854 is published by Emerald and is available at https://dx.doi.org/10.1108/ECAM-05-2018-0204 |
Appears in Collections: | Journal/Magazine Article |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Chan_Success_BIM_Implementation .pdf | Pre-Published version | 976.96 kB | Adobe PDF | View/Open |
Page views
391
Last Week
1
1
Last month
Citations as of Apr 13, 2025
Downloads
316
Citations as of Apr 13, 2025
SCOPUSTM
Citations
91
Citations as of May 8, 2025
WEB OF SCIENCETM
Citations
75
Citations as of May 8, 2025

Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.