Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/89089
PIRA download icon_1.1View/Download Full Text
Title: Research on post-Wenchuan earthquake recovery and reconstruction implementation : a case study of housing reconstruction of Dujiangyan City
Authors: Li, Q 
Umaier, K 
Koide, O 
Issue Date: Dec-2019
Source: Progress in disaster science, Dec. 2019, v. 4, 100041, p. 1-10
Abstract: This paper is a systematic study on the reconstruction planning and policy implementation of the Wenchuan earthquake. It mainly summarizes the whole process of reconstruction from the perspective of post-disaster housing reconstruction. From both macro and micro scales, it carries out an in-depth analysis of the emergency response and reconstruction mechanisms adopted by the central and local governments after the earthquake occurred. The content mainly includes housing disaster assessment, housing reconstruction process management, and housing reconstruction particular policies, which are the key factors affecting post-disaster reconstruction benefits. To better explain the great success of the Wenchuan earthquake recovery and reconstruction policy for housing reconstruction, this paper conducts a detailed investigation of the reconstruction planning, policies, implementation and results of the housing reconstruction in Dujiangyan central city. The study found that the diversification of the Dujiangyan housing reconstruction development model has mostly met the different needs of the victims. The participation of multiple entities such as the market and social institutions has accelerated the economic recovery of post-disaster reconstruction and promoted the early completion of housing work; The unique system introduced during the reconstruction process not only protected the interests of the victims, but also effectively solved the complex property rights problem in rural areas, achieved the goal of saving land and integrating resources, and replaced a large number of land resources for the government.
Keywords: Post-Disaster housing reconstruction
Reconstruction management
Reconstruction mode and policy
Wenchuan earthquake
Publisher: Elsevier
Journal: Progress in disaster science 
ISSN: 2590-0617
DOI: 10.1016/j.pdisas.2019.100041
Rights: © 2019 The Author(s). Published by Elsevier Ltd. This is an open accessarticle under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
The following publication Li, Q., Umaier, K., & Koide, O. (2019). Research on post-wenchuan earthquake recovery and reconstruction implementation: A case study of housing reconstruction of dujiangyan city. Progress in Disaster Science, 4 , 100041, 1-10 is available at https://dx.doi.org/10.1016/j.pdisas.2019.100041
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
1-s2.0-S2590061719300419-main.pdf1.75 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

66
Last Week
0
Last month
Citations as of Nov 9, 2025

Downloads

51
Citations as of Nov 9, 2025

SCOPUSTM   
Citations

29
Citations as of Dec 19, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.