Title: | Hierarchical task network approach for time and budget constrained construction project planning | Authors: | Liu, D Wang, HW Li, H Wang, J Khallaf, M |
Issue Date: | 2019 | Source: | Technological and economic development of economy, 2019, v. 25, no. 3, p. 472-495 | Abstract: | Completing a construction project on time and within budget is of great importance in the construction industry. To achieve this goal, a construction plan satisfying the time and cost constraints is crucial. While a rich amount of literature on the time-cost trade-off scheduling and time/cost optimization scheduling has been presented, developing a construction plan for the time and cost-constrained construction project has not been fully explored. This study presented a hierarchical task network (HTN) based construction planning model to fill this gap. First of all, a knowledge formalism catering to the HTN planning was provided to accommodate the construction planning knowledge. Then, the planning process was explained in detail, including temporal reasoning used to sequence the construction activities, and backtracking evasion mechanism used to avoid the trouble of backtracking due to inappropriate selection of execution modes for construction activities. Finally, two sets of comparisons based on a fictional construction project were performed, the results of which demonstrate that the time and budget constraints have an impact on the sec-tion of execution modes for construction methods, and the proposed planning model can develop construction plan that satisfies the specified deadline and budget limitations effectively regardless of the existing of backtracking. | Keywords: | Budget limitation Construction planning Hierarchical task network planning Project deadline |
Publisher: | Vilnius Gediminas Technical University | Journal: | Technological and economic development of economy | ISSN: | 2029-4913 | EISSN: | 2029-4921 | DOI: | 10.3846/tede.2019.9384 | Rights: | Copyright © 2019 The Author(s). Published by VGTU Press. This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited. The following publication Liu, D., Wang, H.- wei, Li, H., Wang, J., & Khallaf, M. (2019). Hierarchical task network approach for time and budget constrained construction project planning. Technological and Economic Development of Economy, 25(3), 472-495 is available at https://doi.org/10.3846/tede.2019.9384 |
Appears in Collections: | Journal/Magazine Article |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Liu_Hierarchical_task_network.pdf | 1.6 MB | Adobe PDF | View/Open |
Page views
54
Last Week
1
1
Last month
Citations as of May 28, 2023
Downloads
70
Citations as of May 28, 2023
SCOPUSTM
Citations
6
Citations as of Jun 1, 2023
WEB OF SCIENCETM
Citations
6
Citations as of Jun 1, 2023

Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.