Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/61168
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estateen_US
dc.creatorLi, CZDen_US
dc.creatorHong, JKen_US
dc.creatorXue, Fen_US
dc.creatorShen, GQen_US
dc.creatorXu, XXen_US
dc.creatorMok, MKYen_US
dc.date.accessioned2016-12-19T08:55:00Z-
dc.date.available2016-12-19T08:55:00Z-
dc.identifier.issn0959-6526en_US
dc.identifier.urihttp://hdl.handle.net/10397/61168-
dc.language.isoenen_US
dc.publisherElsevieren_US
dc.rights© 2016 Elsevier Ltd. All rights reserved.en_US
dc.rights© 2016 This manuscript version is made available under the CC-BY-NC-ND 4.0 license http://creativecommons.org/licenses/by-nc-nd/4.0/en_US
dc.rightsNOTICE: this is the author’s version of a work that was accepted for publication in Journal of Cleaner Production. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. The definitive version Li Z.D., Hong J.K., Xue F., Shen G.Q.P., Xu X.X., Mok M. (2016). Schedule risks in prefabrication housing production in Hong Kong: a social network analysis, Journal of Cleaner Production, 134, 482-494 is available at https://doi.org/10.1016/j.jclepro.2016.02.123en_US
dc.subjectBuilding information modelingen_US
dc.subjectPrefabrication housing productionen_US
dc.subjectSchedule risken_US
dc.subjectSocial network analysisen_US
dc.titleSchedule risks in prefabrication housing production in Hong Kong : a social network analysisen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage482en_US
dc.identifier.epage494en_US
dc.identifier.volume134en_US
dc.identifier.doi10.1016/j.jclepro.2016.02.123en_US
dcterms.abstractVarious schedule risks beset prefabrication housing production (PHP) in Hong Kong throughout the prefabrication supply chain, from design, manufacturing, logistics, to on-site assembly. Previous research on the risks in prefabrication construction projects has mainly focused on the construction stage and has been confined to issues of completeness and accuracy without consideration of stakeholder-related risks and their cause-and-effect relationships. However, in reality, the supply chain is inseparable as precast components should be manufactured and transported to sites to fit in with the schedule of on-site assembly in seamless connection manner, and most risks are interrelated and associated with various stakeholders. This study applies social network analysis (SNA) to recognize and investigate the underlying network of stakeholder-associated risk factors in prefabrication housing construction projects. Critical risks and relationships that have important roles in structuring the entire network of PHP are identified and analyzed. BIM (Building Information Modeling)-centered strategies are proposed to facilitate stakeholder communication and mitigate critical schedule risks and interactions underlying the risk network. This study not only provides an effective method to analyze stakeholder-associated risk factors and to evaluate the effect of these risk factors from a network perspective, but also offers a new visual perspective in the promotion of the use of the Internet of things (IoT) and helps identify housing construction problems in Hong Kong.en_US
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationJournal of cleaner production, 15 Oct. 2016, v. 134, pt. B, p. 482-494en_US
dcterms.isPartOfJournal of cleaner productionen_US
dcterms.issued2016-10-
dc.identifier.isiWOS:000382797200006-
dc.identifier.scopus2-s2.0-84961784515-
dc.identifier.scopus2-s2.0-85024093761-
dc.identifier.ros2016002632-
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumbera0136-n10en_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
Li_Zhengdao_2016.pdfPre-Published version1.83 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

259
Last Week
0
Last month
Citations as of Apr 21, 2024

Downloads

1,409
Citations as of Apr 21, 2024

SCOPUSTM   
Citations

202
Last Week
1
Last month
Citations as of Apr 19, 2024

WEB OF SCIENCETM
Citations

178
Last Week
0
Last month
Citations as of Apr 25, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.