Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/20819
Title: | Factors affecting effectiveness and efficiency of analyzing stakeholders' needs at the briefing stage of public private partnership projects | Authors: | Tang, L Shen, Q |
Issue Date: | 2013 | Source: | International journal of project management, 2013, v. 31, no. 4, p. 513-521 | Abstract: | The briefing stage is of utmost importance to public private partnership (PPP) projects as it conveys the major message regarding what stakeholders need. However, stakeholders' needs are not often stated clearly at the briefing stage. In considering this, the current paper aimed at analyzing the key stakeholders' needs that should be known by project participants. Eighteen factors related to stakeholders' needs were identified based on literature and interviews. The importance of these factors was rated using a questionnaire survey in Hong Kong. Also, it was expected that some background variables should be taken into account when rating these factors. Therefore, other than using simple rating methods, a custom-made weighted ranking method was developed, which could enable an estimation of the weighted importance of stakeholder-related factors. In this research, four background variables were identified and their effects on the aspects such as type and nature of a PPP project, role in a PPP project, and experience working in a PPP project were examined. In order to group the factors, an exploratory factor analysis was conducted and four dimensions were extracted. The relationship of these dimensions with the four background variables were then tested by means of either t-test or ANOVA. Results indicate that the four background variables were important in ranking the aspects. After incorporating the effect of the four background variables, the weighted importance of the 18 factors was analyzed with the weighted ranking method. Finally, discussion about the rank order of the factors is provided. | Keywords: | Briefing stage Construction management Critical factors Factor analysis Public private partnership Stakeholder |
Publisher: | Pergamon Press | Journal: | International journal of project management | ISSN: | 0263-7863 | EISSN: | 1873-4634 | DOI: | 10.1016/j.ijproman.2012.10.010 | Rights: | © 2012 Elsevier Ltd. APM and IPMA. All rights reserved. This is an Author's Accepted Manuscript of an article published in Tang, L., & Shen, Q. (2013). Factors affecting effectiveness and efficiency of analyzing stakeholders' needs at the briefing stage of public private partnership projects. International Journal of Project Management, 31(4), 513-521. The open URL of the article: http://dx.doi.org/10.1016/j.ijproman.2012.10.010 |
Appears in Collections: | Journal/Magazine Article |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Tang_Factors_affecting_effectiveness .pdf | Pre-published version | 175.07 kB | Adobe PDF | View/Open |
Page views
153
Last Week
0
0
Last month
Citations as of Jun 11, 2023
Downloads
672
Citations as of Jun 11, 2023
SCOPUSTM
Citations
62
Last Week
1
1
Last month
1
1
Citations as of Jun 8, 2023
WEB OF SCIENCETM
Citations
52
Last Week
1
1
Last month
0
0
Citations as of Jun 8, 2023

Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.