Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/115717
| Title: | Bi-level stochastic programming for optimal modular construction yard deployment based on Benders decomposition | Authors: | Wang, H Yi, W Wu, P Lu, Z Chan, APC |
Issue Date: | 6-Oct-2025 | Source: | Computer-aided civil and infrastructure engineering, 6 Oct. 2025, v. 40, no. 24, p. 3979-3996 | Abstract: | To promote wider adoption of modular construction (MC), many governments in high-density regions are planning to establish module storage yards (MSYs) to support local contractors in achieving just-in-time module supply chain. Given the limited availability of developable land and government budgets, an optimal MSY deployment plan is urgently needed. This paper represents the first attempt at capturing the fundamental government–contractor interactions and formulating a bi-level stochastic program to maximize MSY utilization and minimize MC logistics costs. To address the computational challenges posed by a hierarchical model structure, a solution method based on Benders decomposition is designed to solve the problem to optimality. Benchmarked against particle swarm optimization through extensive numerical experiments, the solution method shows a 15% average improvement in solution quality (in medium- and large-scale instances), highlighting its superior computational performance. A real-world Hong Kong case is conducted as methodology validation and application that provides governments with optimal decisions on MSY deployment including the area of the MSY to be established and module storage service pricing. | Publisher: | Wiley-Blackwell | Journal: | Computer-aided civil and infrastructure engineering | ISSN: | 1093-9687 | EISSN: | 1467-8667 | DOI: | 10.1111/mice.70039 | Rights: | This is an open access article under the terms of the Creative Commons Attribution-NonCommercial License (https://creativecommons.org/licenses/by-nc/4.0/), which permits use, distribution and reproduction in any medium, provided the original work is properly cited and is not used for commercial purposes. © 2025 The Author(s). Computer-Aided Civil and Infrastructure Engineering published by Wiley Periodicals LLC on behalf of Editor. The following publication Wang, H., Yi, W., Wu, P., Zhen, L., & Chan, A. P. C. (2025). Bi-level stochastic programming for optimal modular construction yard deployment based on Benders decomposition. Computer-Aided Civil and Infrastructure Engineering, 40, 3979–3996 is available at https://doi.org/10.1111/mice.70039. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Wang_Bi‐level_Stochastic_Programming.pdf | 1.13 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



