Title: | Deploying bottleneck management strategies for ameliorating critical delays in building construction projects : a case for developing country of Iran | Authors: | Karimi, H Sarvari, H Edwards, DJ Chan, DWM Olawumi, TO |
Issue Date: | Jun-2024 | Source: | Systems, June 2024, v. 12, no. 6, 195 | Abstract: | One of the primary concerns and challenges encountered in the construction industry is the emergence of crucial factors instigating project delays throughout the construction project lifecycle (CPL). The critical delay factors (CDFs) are the significant factors that not only cause project delays but also create obstacles and bottlenecks for the projects. Hence, the current study aims to determine CDFs affecting project completions and ameliorates the adverse situation by developing relevant bottleneck management strategies. To achieve this goal, a desktop review of previous research studies was undertaken to identify the CDFs in the CPL. The brainstorming technique was further utilized to filter the identified CDFs and match them to the context of developing countries, using Iran as a case example. Finally, an empirical questionnaire was created that included 22 CDFs divided into three distinct groups. The questionnaire’s validity and reliability were checked and validated before massive distribution to target respondents. Sixty industry experts appraised the identified CDFs in the CPL based on two assessment criteria: the severity of impact and probability of occurrence. The findings revealed that the groups with the most significant level of impact (out of 5 points) are project planning and design (2.29), construction and delivery (1.99), and policymaking and legislation (1.72). Similarly, the groups of project planning and design (2.30), construction and delivery (2.20), and policymaking and legislation (1.5) were ranked from first to third based on the probability of occurrence. According to the survey findings, the project planning and design stage is the most optimal time to mitigate the impact of project delays. Moreover, the study posited some pragmatic recommendations as bottleneck management strategies for ameliorating the identified CDFs for future projects. The study deliverables can serve as an effective tool for project stakeholders and decision makers to diminish the impact on and penetration of CDFs into building construction projects and enhance the delivery path leading to project success. | Keywords: | Bottleneck management Construction projects Iran Project delays Strategic plan |
Publisher: | MDPI AG | Journal: | Systems | EISSN: | 2079-8954 | DOI: | 10.3390/systems12060195 | Rights: | © 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). The following publication Karimi, H., Sarvari, H., Edwards, D. J., Chan, D. W. M., & Olawumi, T. O. (2024). Deploying Bottleneck Management Strategies for Ameliorating Critical Delays in Building Construction Projects: A Case for Developing Country of Iran. Systems, 12(6), 195 is available at https://doi.org/10.3390/systems12060195. |
Appears in Collections: | Journal/Magazine Article |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
systems-12-00195-v2.pdf | 1.76 MB | Adobe PDF | View/Open |
Page views
8
Citations as of Apr 14, 2025
Downloads
2
Citations as of Apr 14, 2025

Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.