Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/111653
PIRA download icon_1.1View/Download Full Text
Title: Adapting to change : redefining employee utilization in construction projects through lessons learnt from COVID-19
Authors: Arshad, M
Sumbal, MS 
Akhtar, MN
Nauman, S
Issue Date: 2025
Source: Employee relations, 2025, v. 47, no. 1, p. 193-216
Abstract: Purpose: The study aims to understand the challenges of effective employee utilization in construction projects during the coronavirus disease 2019 (COVID-19) pandemic in a developing country and to develop mitigation strategies for post-pandemic workforce management.
Design/methodology/approach: We used a qualitative research design to conduct semi-structured interviews with elite informants of various construction firms and analyze the data using thematic analysis.
Findings: The results showed that numerous factors, including supply chain issues, inadequate worker healthcare, ineffective knowledge management and job losses, have negatively impacted the construction industry. The prominent outcomes of the study are a conceptual framework for effective workforce management post-pandemic and beyond, including recommendations for managers and executives and future research.
Originality/value: The workforce management framework with knowledge management developed in this study provides a new theoretical view of post-pandemic mitigation strategies through the theoretical lens of dynamics capabilities and knowledge management. The findings cover industrial insights, particularly from the stakeholders’ perspective, and provide a solid foundation for future research in this domain.
Keywords: Construction industry
COVID-19
Employee utilization
Workforce management
Publisher: Emerald Publishing Limited
Journal: Employee relations 
ISSN: 0142-5455
EISSN: 1758-7069
DOI: 10.1108/ER-06-2023-0320
Rights: ©Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher.
The following publication Arshad, M., Sumbal, M.S., Akhtar, M.N. and Nauman, S. (2025), "Adapting to change: redefining employee utilization in construction projects through lessons learnt from COVID-19", Employee Relations, Vol. 47 No. 1, pp. 193-216 is published by Emerald and is available at https://doi.org/10.1108/ER-06-2023-0320.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Arshad_Adapting_Change_Redefining.pdfPre-Published version996.72 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

13
Citations as of Apr 14, 2025

Downloads

3
Citations as of Apr 14, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.