| Title: | Data-driven out-of-order model for synchronized planning, scheduling, and execution in modular construction fit-out management | Authors: | Jiang, Y Li, M Ma, BJ Zhong, RY Huang, GQ |
Issue Date: | 15-Aug-2024 | Source: | Computer-aided civil and infrastructure engineering, 15 Aug. 2024, v. 39, no. 16, p. 2457-2480 | Abstract: | Fit-out operations in modular construction exhibit unique features, such as limited room space and diversely distributed operations in the building. These features pose significant challenges to planning, scheduling, and execution (PSE) of fit-out activities due to operational parallelism, distributional diversity, and narrower constrained time window in modular construction. Hence, logistics-operation and multi-operations synchronizations in a real-time manner are crucial for PSE of modular construction fit-out management. With the support of cutting-edge information technologies, the real-time data inside the generated digital twins can simplify online optimization models and convert stochastic factors into deterministic parameters. This paper formulates a novel real-time data-driven Out-of-Order (OoO) model for synchronized PSE in modular construction fit-out management. Drawing inspiration from OoO mechanism in Central Processing Unit (CPU), a real-time data-driven and rolling-horizon-based OoO model is proposed for PSE of modular construction fit-out, employing a forward heuristic algorithm for solution. Time–space–state data from digital twins are updated to facilitate dynamic decision-making of managers. Through stochastic computational experiments, we demonstrate the effectiveness of OoO model in optimizing project metrics and the improved resilience in uncertain environments. | Publisher: | Wiley-Blackwell Publishing, Inc. | Journal: | Computer-aided civil and infrastructure engineering | ISSN: | 1093-9687 | EISSN: | 1467-8667 | DOI: | 10.1111/mice.13203 | Rights: | This is an open access article under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/), which permits use, distribution and reproduction in any medium, provided the original work is properly cited. © 2024 The Authors. Computer-Aided Civil and Infrastructure Engineering published by Wiley Periodicals LLC on behalf of Editor. The following publication Jiang, Y., Li, M., Ma, B. J., Zhong, R. Y., & Huang, G. Q. (2024). Data-driven out-of-order model for synchronized planning, scheduling, and execution in modular construction fit-out management. Computer-Aided Civil and Infrastructure Engineering, 39, 2457–2480 is available at https://doi.org/10.1111/mice.13203. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Jiang_Data‐driven_Out‐of‐order_Model.pdf | 2.35 MB | Adobe PDF | View/Open |
Page views
19
Citations as of Apr 14, 2025
Downloads
9
Citations as of Apr 14, 2025
SCOPUSTM
Citations
6
Citations as of Sep 12, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.