Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/109637
Title: | Shop floor dispatching with variable urgent operations based on Workload Control : an assessment by simulation | Authors: | Yuan, M Ma, L Qu, T Thürer, M |
Issue Date: | Sep-2023 | Source: | IET collaborative intelligent manufacturing, Sept 2023, v. 5, no. 3, e12084 | Abstract: | Meeting customer time requirements poses a major challenge in the context of high-variety make-to-order companies. Companies need to reduce the lead time and process urgent jobs in time, while realising high delivery reliability. The key decision stages within Workload Control (WLC) are order release and shop floor dispatching. To the best of our knowledge, recent research has mainly focused on order release stage and inadvertently ignored shop floor dispatching stage. Meanwhile, urgency of job is not only related to its due date, but also affected by the dynamics of shop floor. Specifically, urgency of jobs may decrease at downstream operations in the job's routing, since priority dispatching for urgent jobs accelerates production speed at the upstream operations. And occupying production resources increases the waiting time of non-urgent jobs at workstation. This phenomenon leads to the change of urgency of jobs. Misjudgement of urgent jobs therefore may result in actual urgent jobs not being processed in time. In response, the authors focus on shop floor dispatching stage and consider the transient status of urgent operations in the context of WLC. The urgency of jobs is rejudged at the input buffer of each workstation, which is firstly defined as urgent operations and non-urgent operations. Using simulation, the results show that considering the transient status of urgent operations contributes to speeding up production for actual urgent jobs and meeting delivery performance both in General Flow Shop and Pure Job Shop. In addition, percentage tardy performance is greatly affected by norm levels, especially at the severe urgent level. These have important implications on how urgent operations should be designed and how norm level should be set at shop floor dispatching stage. | Keywords: | Job shop scheduling Manufacturing industries Manufacturing systems |
Publisher: | The Institution of Engineering and Technology | Journal: | IET collaborative intelligent manufacturing | EISSN: | 2516-8398 | DOI: | 10.1049/cim2.12084 | Rights: | © 2023 The Authors. IET Collaborative Intelligent Manufacturing published by John Wiley & Sons Ltd on behalf of The Institution of Engineering and Technology. This is an open access article under the terms of the Creative Commons Attribution‐NonCommercial‐NoDerivs License (http://creativecommons.org/licenses/by-nc-nd/4.0/), which permits use and distribution in any medium, provided theoriginal work is properly cited, the use is non‐commercial and no modifications or adaptations are made. The following publication Yuan, M., et al.: Shop floor dispatching with variable urgent operations based on Workload Control: an assessment by simulation. IET Collab. Intell. Manuf. e12084 (2023) is available at https://doi.org/10.1049/cim2.12084. |
Appears in Collections: | Journal/Magazine Article |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Yuan_Shop_Floor_Dispatching.pdf | 1.17 MB | Adobe PDF | View/Open |
Page views
3
Citations as of Nov 17, 2024
Downloads
6
Citations as of Nov 17, 2024
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.