Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/108886
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building Environment and Energy Engineering-
dc.creatorFeng, Xen_US
dc.creatorGuo, Zen_US
dc.creatorZhang, Zen_US
dc.date.accessioned2024-09-09T00:41:55Z-
dc.date.available2024-09-09T00:41:55Z-
dc.identifier.issn2004-2965en_US
dc.identifier.urihttp://hdl.handle.net/10397/108886-
dc.description9th Applied Energy Symposium: Low Carbon Cities and Urban Energy Systems (CUE2023), Sep. 2-7, 2023, Matsue & Tokyo, Japanen_US
dc.language.isoenen_US
dc.publisherScanditale ABen_US
dc.rightsCopyright for all published articles within Energy Proceedings are retained to its credited authors. All peer-reviewed research article under publication in Energy Proceedings will be licensed under an open access following Creative Commons Attribution-NonCommercial-NoDerivs (CC BY-NC-ND) (see https://creativecommons.org/licenses/by/4.0/). It means for non-commercial purposes, anyone may use, process, and distribute the article (or part of it) if the author is credited. The article will not be altered or modified while the author(s) are credited.en_US
dc.rightsThe following publication Feng, X., Guo, Z., & Zhang, Z. (2023). Assessment of PV Potential in Mountain Areas Using Four Muti-Criteria Decision Methods. Energy Proceedings, 36 is available at https://doi.org/10.46855/energy-proceedings-10711.en_US
dc.subjectGeneration potentialen_US
dc.subjectLevelized cost of electricityen_US
dc.subjectMountainous areasen_US
dc.subjectMulti-Criteria Decision Makingen_US
dc.subjectPVen_US
dc.titleAssessment of PV potential in mountain areas using four muti-criteria decision methodsen_US
dc.typeConference Paperen_US
dc.identifier.volume36en_US
dc.identifier.doi10.46855/energy-proceedings-10711en_US
dcterms.abstractIn this study, Yongren County, Yunnan Province was selected as the study case, and a photovoltaic (PV) power potential assessment system based on Geographic Information System (GIS) and Multi-Criteria Decision Making (MCDM) method was used to calculate the PV power potential in mountainous areas and to estimate the levelized cost of electricity for PV power generation in mountainous areas. The results show that the ordinal priority approach (OPA)-MCDM is the best among the four different multi-criteria decision methods, and the selected optimal PV construction area fits well with the existing PV facilities, which demonstrates the effectiveness of the proposed method. The PV power generation potential is about 7861.953 million kwh, and the levelized cost of electricity is 0.3963 RMB/kWh. The estimated annual power generation capacity can meet the social power demand of Chuxiong Prefecture.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationEnergy proceedings, 2023, v. 36, https://doi.org/10.46855/energy-proceedings-10711en_US
dcterms.isPartOfEnergy proceedingsen_US
dcterms.issued2023-
dc.identifier.scopus2-s2.0-85190671861-
dc.relation.conferenceLow Carbon Cities and Urban Energy Systems [CUE]-
dc.description.validate202409 bcch-
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_Others-
dc.description.fundingSourceSelf-fundeden_US
dc.description.pubStatusPublisheden_US
dc.description.oaCategoryCCen_US
Appears in Collections:Conference Paper
Files in This Item:
File Description SizeFormat 
1697016095.pdf563.12 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

71
Citations as of Apr 14, 2025

Downloads

20
Citations as of Apr 14, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.