Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/103886
| Title: | Scheduling of jobs with multiple weights on a single machine for minimizing the total weighted number of tardy jobs | Authors: | Guo, S Lang, H Zhang, H |
Issue Date: | Feb-2023 | Source: | Mathematics, Feb. 2023, v. 11, no. 4, 1013 | Abstract: | We consider the scheduling of jobs with multiple weights on a single machine for minimizing the total weighted number of tardy jobs. In this setting, each job has m weights (or equivalently, the jobs have m weighting vectors), and thus we have m criteria, each of which is to minimize the total weighted number of tardy jobs under a corresponding weighting vector of the jobs. For this scheduling model, the feasibility problem aims to find a feasible schedule such that each criterion is upper bounded by its threshold value, and the Pareto scheduling problem aims to find all the Pareto-optimal points and for each one a corresponding Pareto-optimal schedule. Although the two problems have not been studied before, it is implied in the literature that both of them are unary NP-hard when m is an arbitrary number. We show in this paper that, in the case where m is a fixed number, the two problems are solvable in pseudo-polynomial time, the feasibility problem admits a dual-fully polynomial-time approximation scheme, and the Pareto-scheduling problem admits a fully polynomial-time approximation scheme. | Keywords: | Scheduling Pareto-optimal points Multi-weights Tardy jobs |
Publisher: | MDPI | Journal: | Mathematics | EISSN: | 2227-7390 | DOI: | 10.3390/math11041013 | Rights: | © 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). The following publication Guo, S., Lang, H., & Zhang, H. (2023). Scheduling of Jobs with Multiple Weights on a Single Machine for Minimizing the Total Weighted Number of Tardy Jobs. Mathematics, 11(4), 1013 is available at https://doi.org/10.3390/math11041013. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| mathematics-11-01013.pdf | 362.61 kB | Adobe PDF | View/Open |
Page views
111
Last Week
1
1
Last month
Citations as of Nov 9, 2025
Downloads
39
Citations as of Nov 9, 2025
SCOPUSTM
Citations
3
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
3
Citations as of Dec 18, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



