Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/103553
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Civil and Environmental Engineeringen_US
dc.creatorAnwar, GAen_US
dc.creatorDong, Yen_US
dc.date.accessioned2023-12-20T07:14:52Z-
dc.date.available2023-12-20T07:14:52Z-
dc.identifier.isbn978-1-927877-79-1en_US
dc.identifier.urihttp://hdl.handle.net/10397/103553-
dc.language.isoenen_US
dc.publisherAvestia Publishingen_US
dc.rightsPosted with permission of the conference organizer.en_US
dc.subjectWater networken_US
dc.subjectElectrical and power networken_US
dc.subjectRecoveryen_US
dc.subjectResilienceen_US
dc.subjectSeismic hazarden_US
dc.titleRestoration modelling of water network under seismic hazard : role of electrical and power networken_US
dc.typeConference Paperen_US
dc.identifier.spage281-1en_US
dc.identifier.epage281-7en_US
dc.identifier.doi10.11159/iccste20.281en_US
dcterms.abstractThe socio-economic wellbeing of a community depends on the proper functioning of its critical infrastructure system. Two most important critical infrastructure systems i.e., Water Network (WN) system, and Electrical and Power Network (EPN) system are crucial for the full functioning of the households, and socio-economic wellbeing of its citizens. After an extreme event, the functionality of the households will be reduced due to the damage in the WN and EPN. The functionality of the WN may also depend on the recovery of the EPN and should be considered for better estimates of the functionality recovery of interdependent critical infrastructure system. In this paper, the restoration modelling of WN is assessed under a maximum considered seismic hazard scenario, considering the dependence on the EPN network. The fragility and consequence functions are utilized for the damage and repair time assessment of each component. The repair times for each component are evaluated and the total repair time of the WN and EPN is determined. The WN and EPN restoration modelling is assessed through network models where the nodes represent the sub-components of a network and edges represent the connection restoration. In the considered example, the WN is fully repaired in 8 days after an earthquake event, while the EPN is fully repaired in 10 days. The WN will therefore be fully functional after 10 days since the power plant component of WN requires electricity from EPN network to pump water form reservoir to the water tank. It is therefore important to consider the dependencies of WN on the EPN for better estimates of functionality recovery of critical utilities to the households.en_US
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationProceedings of the 5th International Conference on Civil, Structural and Transportation Engineering (ICCSTE'20), 12-14 Nov. 2020, Virtual Conference, paper no. 281, p. 1-7en_US
dcterms.issued2020-
dc.relation.conferenceInternational Conference on Civil Structural and Transportation Engineering [ICCSTE]en_US
dc.identifier.artn281en_US
dc.description.validate202312 bcchen_US
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberCEE-1112-
dc.description.fundingSourceSelf-fundeden_US
dc.description.pubStatusPublisheden_US
dc.identifier.OPUS40240914-
dc.description.oaCategoryPublisher permissionen_US
Appears in Collections:Conference Paper
Files in This Item:
File Description SizeFormat 
ICCSTE_281.pdf690.66 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

126
Last Week
7
Last month
Citations as of Nov 9, 2025

Downloads

39
Citations as of Nov 9, 2025

SCOPUSTM   
Citations

1
Citations as of Jun 21, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.