Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/103120
Title: | The influence of exterior obstruction on the integrated evaluation of daylight utilization during initial design stage | Authors: | Sun, J Li, Z Xiao, F |
Issue Date: | 2017 | Source: | Procedia engineering, 2017, v. 205, p. 2785-2792 | Abstract: | This paper presents a concise parametric study to investigate the influence of external obstruction on the evaluation of daylight utilization during design stage. A generic building located in Hong Kong has been established with dimmable controlled lighting system and interior shade. Multiple simulations under different external obstruction patterns are conducted with simulation engine EnergyPlus. Metrics on daylight availability, together with energy performance of both lighting and air conditioning system are analyzed. The result indicates that the ground floor is the most vulnerable to the existence of exterior obstruction and building zones of different orientation are affected in different ways. Further analysis also shows the impact from obstruction is not necessarily negative for daylight utilization cases. An overall assessment of this impact requires an integrated evaluation including both lighting and air conditioning system. These all demonstrate the necessity of taking exterior obstruction into consideration during the design stage. | Keywords: | Daylight availability Energy efficiency Exterior obstruction Cooling and heating load Sensitivity analysis |
Publisher: | Elsevier | Journal: | Procedia engineering | EISSN: | 1877-7058 | DOI: | 10.1016/j.proeng.2017.09.882 | Description: | 10th International Symposium on Heating, Ventilation and Air Conditioning, ISHVAC2017, 19-22 October 2017, Jinan, China | Rights: | © 2017 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (https://creativecommons.org/licenses/by-nc-nd/4.0/). The following publication Sun, J., Li, Z., & Xiao, F. (2017). The influence of exterior obstruction on the integrated evaluation of daylight utilization during initial design stage. Procedia engineering, 205, 2785-2792 is available at https://doi.org/10.1016/j.proeng.2017.09.882. |
Appears in Collections: | Journal/Magazine Article |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
1-s2.0-S1877705817344405-main.pdf | 752.89 kB | Adobe PDF | View/Open |
Page views
68
Citations as of May 11, 2025
Downloads
24
Citations as of May 11, 2025
SCOPUSTM
Citations
1
Citations as of May 8, 2025

Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.