Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/99593
PIRA download icon_1.1View/Download Full Text
Title: On the structure of bottlenecks in processes
Authors: Dawande, M
Feng, Z 
Janakiraman, G
Issue Date: Jun-2021
Source: Management science, June 2021, v. 67, no. 6, p. 3853-3870
Abstract: Process capacity and the associated notions of bottleneck activities and bottleneck resources—which are responsible for limiting process capacity to its present value—are fundamental concepts in the operations management literature. However, for processes that involve collaboration and multitasking, there is little clarity in the literature on what bottlenecks are, what they look like, and how they can be identified. In this paper, we formulate and analyze graph-theoretic optimization problems that determine bottleneck structures of activities and the associated bottleneck sets of resources in deterministic, single-product processes with possibly multiple copies of one or more resources and possibly multiple sets of resources that can perform each activity. In the presence of both collaboration and multitasking, sets of activities that are interconnected in a specific manner via shared resources form bottleneck structures that are responsible for limiting capacity. We use the collaboration graph of the process to either characterize bottleneck structures completely or identify graphical structures that must necessarily be part of any bottleneck structure. Our analysis reveals a natural hierarchy in the algorithmic approach for identifying bottleneck structures as processes become increasingly sophisticated, ranging from the “easy” case where the simple bottleneck formula correctly identifies bottlenecks to more complex cases where one needs to solve progressively complicated mathematical programs. In turn, this understanding helps us obtain prescriptive answers to several questions of interest to managers, for example, the budget-constrained procurement of resources to maximize capacity improvement and the design of processes to increase capacity without procuring additional resources.
Keywords: Process capacity
Bottlenecks
Collaboration
Multitasking
Mathematical programming
Publisher: Institute for Operations Research and the Management Sciences
Journal: Management science 
ISSN: 0025-1909
EISSN: 1526-5501
DOI: 10.1287/mnsc.2020.3704
Rights: © 2020 INFORMS
This is the accepted manuscript of the following article: Milind Dawande, Zhichao Feng, Ganesh Janakiraman (2020) On the Structure of Bottlenecks in Processes. Management Science 67(6):3853-3870, which has been published in final form at https://doi.org/10.1287/mnsc.2020.3704.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Dawande_Structure_Bottlenecks_Processes.pdfPre-Published version771.54 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

94
Citations as of Apr 14, 2025

Downloads

262
Citations as of Apr 14, 2025

SCOPUSTM   
Citations

3
Citations as of Jun 21, 2024

WEB OF SCIENCETM
Citations

2
Citations as of Aug 29, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.