Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/98381
| Title: | SGICT builds an optimization-based system for daily berth planning | Authors: | Ding, Y Jia, S Gu, T Li, CL |
Issue Date: | Jul-2016 | Source: | Interfaces, July-Aug. 2016, v. 46, no. 4, p. 281-296 | Abstract: | In container terminal operations, the allocation of berth-side resources to serve calling vessels is called berth planning. For each vessel, berth planning generally involves determining the time interval for berth stay (i.e., berthing and departure times and the handling of start and end times), the berthing position along the quay, and the number of quay cranes that will be dedicated to handle it. The objectives are to maximize the vessel service levels (i.e., minimize the departure lateness) and minimize operating costs during a planning horizon. In this paper, we describe the implementation of an operations research-based solution at Shanghai Guandong International Container Terminal (SGICT), one of the largest container terminals at the Port of Shanghai, to optimize its daily berth planning. We embed our solution into a decision support system (BAPOPT), which provides SGICT's planners with effective and executable berth plans. Using BAPOPT, SGICT expects to improve its vessel-handling productivity by at least 15 percent. With the support of BAPOPT, SGICT has started shifting its operational emphasis from reactive real-time dispatching to proactive resource planning, helping to relieve its operations department from a considerable amount of tedious work and improve the efficiency of its planning department. | Keywords: | Berth allocation Container terminal optimization Decision support system Quay crane allocation |
Publisher: | Institute for Operations Research and the Management Sciences | Journal: | Interfaces | ISSN: | 0092-2102 | EISSN: | 1526-551X | DOI: | 10.1287/inte.2016.0848 | Rights: | © 2016 INFORMS This is the accepted manuscript of the following article: Ding, Y., Jia, S., Gu, T., & Li, C. L. (2016). SGICT builds an optimization-based system for daily berth planning. Interfaces, 46(4), 281-296, which has been published in final form at https://doi.org/10.1287/inte.2016.0848. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Li_Sgict_Builds_Optimization-Based.pdf | Pre-Published version | 1.12 MB | Adobe PDF | View/Open |
Page views
91
Citations as of Apr 14, 2025
Downloads
96
Citations as of Apr 14, 2025
SCOPUSTM
Citations
17
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
16
Citations as of Oct 10, 2024
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



