| Title: | Factors affecting delays in rail transportation projects using Analytic Network Process : the case of Iran | Authors: | Tavassolirizi, M Sarvari, H Chan, DWM Olawumi, TO |
Issue Date: | 2022 | Source: | International journal of construction management, 2022, v. 22, no. 14, p. 2712-2723 | Abstract: | Delays in the implementation and commissioning of rail transportation projects can cause economic damages to project stakeholders and the cities linked by such rail networks. Hence, the current study aims to investigate the key delay factors and provides salient recommendations. In this study, multi-criteria decision-making–the Analytic Network Process (ANP) and the DEMATEL (Decision Making trial and evaluation laboratory) method was employed to help decision-makers in prioritizing these delay factors and evaluating their interactions, respectively. A Delphi approach was used to validate the study’s findings via expert questionnaire surveys–based on a rail transportation development project for the Mobarakeh Steel Complex (MSC). The study’s findings revealed the management factors as the most important delay factors, followed closely by the financial, design, and implementation factors. Other potent issues include the existence of numerous decision-making stations, lack of central role, and sufficient authority for the project managers are responsible for project delays. Overall, the results show that resolving problems with the ‘management’ domain can significantly avoid or alleviate the extent of delays in rail transportation development projects. The study’s findings and recommendations can serve as a policy and consultative instrument for the relevant stakeholders in the railway industry. | Keywords: | Analytic Network Process (ANP) DEMATEL Iran Project delays Rail transportation project |
Publisher: | Taylor & Francis | Journal: | International journal of construction management | ISSN: | 1562-3599 | EISSN: | 2331-2327 | DOI: | 10.1080/15623599.2020.1819946 | Rights: | © 2020 Informa UK Limited, trading as Taylor & Francis Group This is an Accepted Manuscript of an article published by Taylor & Francis in International Journal of Construction Management on 21 Sep 2020 (published online), available at: http://www.tandfonline.com/10.1080/15623599.2020.1819946 |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Tavassoli_Delays_Rail_Transportation.pdf | Pre-Published version | 1.49 MB | Adobe PDF | View/Open |
Page views
95
Last Week
0
0
Last month
Citations as of Apr 14, 2025
Downloads
169
Citations as of Apr 14, 2025
SCOPUSTM
Citations
24
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
16
Citations as of Oct 10, 2024
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.