Title: A building project-based industrialized construction maturity model involving organizational enablers : a multi-case study in China
Authors: Wang, G
Liu, H
Li, H 
Luo, X 
Liu, J
Issue Date: 2020
Source: Sustainability, 2020, v. 12, no. 10, 4029
Abstract: Industrialized construction (IC) as a promising construction mode has been increasingly adopted in China due to its advantages of enhancing productivity and reducing the labor intensiveness in the construction industry. An objective and systematic evaluation of the IC mode is essential by clarifying the current weak areas in application and improving project performance. The meager existing studies have considered evaluating the IC maturity of prefabricated construction projects from the perspective of project governance. This study proposed an industrialized construction maturity model (ICMM) involving organizational enablers by employing the framework of the well-established European Foundation for Quality Management (EFQM) excellence model. The evaluation indicator system consisting of two parts (i.e., "enablers" and "results") were abstracted by a literature review and expert interviews. The analytic hierarchy process (AHP) approach was used to weight the indicators. The maturity of IC projects was rated as four levels (i.e., initial, upgraded, integrated, and optimal levels). The proposed ICMM was validated by conducting a multi-case study, four typical building projects that adopted prefabricated construction techniques in Shanghai were selected and evaluated by the proposed ICMM. Results showed that the ICMM can objectively and comprehensively realize the status quo of IC projects and help managers to identify weak areas of the current IC projects and performance improvement paths from the perspective of project governance. The ICMM was also evaluated to demonstrate its applicability and reliability through expert interviews.
Keywords: CMM
Industrialized construction
Maturity model
Organizational enablers
Performance improvement
Project performance evaluation
The EFQM excellence model
Publisher: Molecular Diversity Preservation International (MDPI)
Journal: Sustainability 
EISSN: 2071-1050
DOI: 10.3390/SU12104029
Rights: © 2020 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http://creativecommons.org/licenses/by/4.0/).
The following publication Wang G, Liu H, Li H, Luo X, Liu J. A Building Project-Based Industrialized Construction Maturity Model Involving Organizational Enablers: A Multi-Case Study in China. Sustainability. 2020; 12(10):4029, is available at https://doi.org/10.3390/su12104029
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Wang_building_project-based_industrialized.pdf3.48 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

106
Last Week
0
Last month
Citations as of May 5, 2024

Downloads

92
Citations as of May 5, 2024

SCOPUSTM   
Citations

12
Citations as of May 3, 2024

WEB OF SCIENCETM
Citations

9
Citations as of May 2, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.