Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/87914
PIRA download icon_1.1View/Download Full Text
Title: A benefits prioritization analysis on adopting BIM systems against major challenges in megaproject delivery
Authors: Chen, Z
Agapiou, A
Li, H 
Issue Date: 2020
Source: Frontiers in built environment, 2020, v. 6, 26
Abstract: Purpose: This article presents a recent research and development experiment on benefits analysis for adopting building information modeling/management (BIM) systems in megaproject delivery across work stages with regard to the needs of project stakeholders. It focuses on a new approach to benefits prioritization to support decision making against major challenges in megaproject delivery.
Methodology: The study was underpinned by an extensive literature review on relevant research and practices across the world, and a questionnaire-based survey on the benefits from adopting BIM in megaproject delivery in Australia. In addition, this study yields new tools for value analysis with regard to the adoption of BIM systems in megaproject delivery, and this include a new calculation method for benefits prioritization, and a new value compass tool to support decisions making on BIM adoption.
Findings: Through the extensive literature review that covers multidisciplinary areas relating to the use of BIM, a set of generic hypotheses was formulated on the comparative level of technical value that various stakeholder groups are expected to achieve from adopting BIM systems in megaproject delivery. These hypotheses were tested by using the questionnaire-based survey. A new benefits prioritization approach was developed to identify the key benefits of BIM systems in megaproject delivery. In addition, a compass tool was also developed to visualize the status of value achievement across project stakeholders in dealing with major challenges in megaproject delivery.
Implications for Research and Practices: By using data collected from the Australian megaproject sector in addition to academic review in Australia, China, and United Kingdom, this experimental study revealed current professional perceptions on the benefits of adopting BIM systems in megaproject delivery in comparison with data and information reported by professionals concerning the adoption of BIM systems from both generic and specific point of view across multiple megaproject stakeholders.
Value: This article provides useful information for both academic research and practical services in the context of quantitative Cost-Benefit Analysis (CBA) on the adoption of BIM systems in megaproject delivery when major challenges on professional competence, budget, schedule and sustainability need to be seriously dealt with. Findings from this experimental study can inform value engineering practice at both strategic and tactic level with regard to adopting BIM systems in megaproject delivery.
Keywords: Abductive reasoning
Benefits prioritization
BIM
Construction management
Megaproject delivery
Multiple source verification
Project lifecycle
Publisher: Frontiers Media S.A.
Journal: Frontiers in built environment 
EISSN: 2297-3362
DOI: 10.3389/fbuil.2020.00026
Rights: Copyright © 2020 Chen, Agapiou and Li. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
The following publication Chen Z, Agapiou A and Li H (2020) A Benefits Prioritization Analysis on Adopting BIM Systems Against Major Challenges in Megaproject Delivery. Front. Built Environ. 6:26, is available at https://doi.org/10.3389/fbuil.2020.00026
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Chen_Benefits_Prioritization_Analysis.pdf2.76 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

42
Last Week
0
Last month
Citations as of May 5, 2024

Downloads

27
Citations as of May 5, 2024

SCOPUSTM   
Citations

9
Citations as of May 3, 2024

WEB OF SCIENCETM
Citations

5
Citations as of May 2, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.