Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/76930
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorMazher, KM-
dc.creatorChan, APC-
dc.creatorZahoor, H-
dc.creatorKhan, MI-
dc.creatorAmeyaw, EE-
dc.date.accessioned2018-06-26T03:03:58Z-
dc.date.available2018-06-26T03:03:58Z-
dc.identifier.issn0733-9364en_US
dc.identifier.urihttp://hdl.handle.net/10397/76930-
dc.language.isoenen_US
dc.publisherAmerican Society of Civil Engineersen_US
dc.rights© 2018 American Society of Civil Engineers.en_US
dc.rightsThe following publication Mazher, K. M., Chan, A. P. C., Zahoor, H., Khan, M. I., & Ameyaw, E. E. (2018). Fuzzy integral-based risk-assessment approach for public-private partnership infrastructure projects. Journal of Construction Engineering and Management, 144(12), 04018111, 1-15 is available at https://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0001573en_US
dc.subjectDecision makingen_US
dc.subjectFuzzy set theoryen_US
dc.subjectFuzzy integralen_US
dc.subjectInfrastructure public-28 private partnershipsen_US
dc.subjectRisk analysisen_US
dc.titleFuzzy integral-based risk-assessment approach for public-private partnership infrastructure projectsen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage1en_US
dc.identifier.epage15en_US
dc.identifier.volume144en_US
dc.identifier.issue12en_US
dc.identifier.doi10.1061/(ASCE)CO.1943-7862.0001573en_US
dcterms.abstractAdequate assessment of risk is essential to assist the stakeholders in planning for efficient risk allocation and mitigation and to ensure success in business and projects. However, it is problematic due to the difficulty in quantification of certain risks, existence of interactions, and multiattribute structure of the project risk assessment task. This paper reports research in which relevant risks were identified for power and transport infrastructure public-private partnership (PPP) projects, which are globally the most active infrastructure sectors for private investment. It further proposes, demonstrates, and validates a novel multiattribute risk assessment model that supports both sectoral and project risk analysis to assist stakeholders in risk management decision making. A 45-factor risk register, established based on literature review and PPP experts’ interviews, was administered to solicit industry-wide perceptions for risk assessment. Application of fuzzy set theory to risk analysis revealed 22 critical risk factors (CRFs) that were categorized into seven critical risk groups (CRGs) of correlated factors using factor analysis. Risk factors that achieved a linguistic assessment of high impact reflect issues related to institutional capacity and the local economy. Further analysis based on fuzzy measure and nonadditive fuzzy integral combined with arithmetic mean helped to obtain an overall risk index (ORI) which indicated a moderate risk outlook for both power and transport infrastructure sectors. Whereas public sector maturity was assessed as a high impact CRG in the power sector, project planning and implementation, project finance, and project revenue were additionally rated as high impact CRGs in the transport infrastructure sector. Demonstration of the developed methodology for a build-operate-transfer (BOT) motorway case study project showed that the private sector stakeholders viewed the project at high risk with all the CRGs evaluated as high impact except the political stability CRG, which was assessed as moderately risky. Test results show that the methodology performed satisfactorily in approximating experts holistic project risk assessments. The developed framework can be used to assess a country’s condition or overall project risk at the initial project stage with little input of time and resources, thus facilitating an efficient and robust risk assessment. Application of fuzzy measure based nonadditive fuzzy integral combined with arithmetic mean for sectoral and project risk assessment, and comparison of sectoral risk analysis from a developing country perspective are some of the key features of this study.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationJournal of construction engineering and management, Dec. 2018, v. 144, no. 12, 04018111, p. 1-15-
dcterms.isPartOfJournal of construction engineering and management-
dcterms.issued2018-12-
dc.identifier.pmid10dd2d3327541cba (EMID)-
dc.identifier.eissn1943-7862en_US
dc.identifier.artn04018111en_US
dc.description.validate201812 bcrcen_US
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumbera0198-n01en_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
Mazher_Fuzzy_Integral-Based_Risk.pdfPre-Published version1.52 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

175
Last Week
4
Last month
Citations as of May 19, 2024

Downloads

446
Citations as of May 19, 2024

WEB OF SCIENCETM
Citations

37
Last Week
0
Last month
Citations as of May 16, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.