Title: A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups
Authors: Wang, X
Cheng, TCE 
Issue Date: May-2006
Source: Computers and operations research, May 2006, v. 33, no. 5, p. 1326-1344
Abstract: This paper studies the two-machine flowshop scheduling problem with class setups in a no-wait processing environment to minimize the maximum lateness. The jobs are divided into job classes and a setup is required at the initial processing of a job or between the processing of jobs of different classes. In a no-wait environment, a job must be processed from start to finish without interruptions on a machine or between the machines. A batch is a maximal subset of consecutively processed jobs of the same class. Several properties concerning the beneficial merging of batches and some dominance rules that improve the objective function are derived. Since the problem is NP-hard, a heuristic is proposed and evaluated computationally. The numerical results demonstrate that the heuristic can produce near-optimal solutions quickly for realistic-sized problems.
Keywords: Flowshop scheduling
Job class setups
No-wait
Heuristic
Maximum lateness
Publisher: Pergamon Press
Journal: Computers and operations research 
ISSN: 0305-0548
EISSN: 1873-765X
DOI: 10.1016/j.cor.2004.09.018
Rights: Computers & Operations Research © 2004 Elsevier Ltd. The journal web site is located at http://www.sciencedirect.com.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
AheuristicApproachForNo_waitFlowshop.pdfPre-published version491.23 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

120
Last Week
0
Last month
Citations as of Apr 21, 2024

Downloads

188
Citations as of Apr 21, 2024

SCOPUSTM   
Citations

24
Last Week
0
Last month
0
Citations as of Apr 26, 2024

WEB OF SCIENCETM
Citations

17
Last Week
0
Last month
0
Citations as of Apr 25, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.