Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/62614
Title: Research on cost ratio of open bid for construction projects——a case study of Chongqing bid market
Other Titles: 建设项目公开招投标成本率研究——以重庆市招投标市场为例
Authors: Ye, Q
Wang, HX
Wong, FKW 
Chan, APC 
Keywords: Transaction cost
Open bid
Tenderee bid cost
Bidder cost
Bid cost rate
Issue Date: 2009
Publisher: 中國建築工業出版社
Source: 建筑经济 (Construction economy), 2009, no. 6, p. 52-60 How to cite?
Journal: 建筑经济 (Construction economy) 
Abstract: 从交易成本理论出发,结合德尔菲法和帕累托原则,构建了建设项目公开招投标成本率模型、招标人成本率模型、投标人成本率模型,并以重庆市招投标市场为例进行了实证研究。采用市场调查和归纳分析法,测算出企业平均招标成本、投标成本和项目招投标成本、招投标成本率。
Based on the transaction cost theory,combined with the Delphi technique and the Pareto theory,this study introduces the construction project public bid cost rate model,the tenderee cost rate model and the bidder cost rate model.It takes Chongqing as a case,using market investigation and analytic induction,to measure the av-erage bid cost,average bidder cost and the whole project bid cost.
URI: http://hdl.handle.net/10397/62614
ISSN: 1002-851X
DOI: 10.14181/j.cnki.1002-851x.2009.06.032
Rights: © 2009 中国学术期刊电子杂志出版社。本内容的使用仅限于教育、科研之目的。
© 2009 China Academic Journal Electronic Publishing House. It is to be used strictly for educational and research purposes.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File SizeFormat 
r48883.pdf305.63 kBAdobe PDFView/Open
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page view(s)

48
Last Week
2
Last month
Checked on Feb 26, 2017

Download(s)

7
Checked on Feb 26, 2017

Google ScholarTM

Check

Altmetric



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.