Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/62612
PIRA download icon_1.1View/Download Full Text
Title: Analysis of critical risk factors for ppp sewage treatment projects based on a sewage treatment project in quanzhou
Other Title: PPP污水处理项目关键风险因素探讨——泉州某污水处理项目实践
Authors: Chan, APC 
Hou, XC
Xu, YL
Wang, YX
Issue Date: 2009
Source: 建筑经济 (Construction economy), 2009, no. 4, p. 40-43
Abstract: 以泉州某污水处理厂项目实践为基础,以特许经营合同为主线,对污水处理厂PPP项目关键风险进行识别和分析,在此基础上提出相应的对策,并根据风险管理原则对其进行合理的分配,从而为项目参与主体,尤其是特许经营人提供一个相对较优的风险管理框架。
This paper aims to review and document the valuable experience of Dongcheng sewage treatment plant in Quanzhou.Eight critical risk factors are examined based on a systemic and comprehensive risk identification and risk analysis.A qualitative analysis looking at countermeasures of risk factors and the rational allocation is conducted.The results provide a risk management framework for project participants,especially for concessionaires.
Keywords: PPP
Concession contract
Risk
Publisher: 中國建築工業出版社
Journal: 建筑经济 (Construction economy) 
ISSN: 1002-851X
DOI: 10.14181/j.cnki.1002-851x.2009.04.012
Rights: © 2009 中国学术期刊电子杂志出版社。本内容的使用仅限于教育、科研之目的。
© 2009 China Academic Journal Electronic Publishing House. It is to be used strictly for educational and research purposes.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
r43096.pdf211.19 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

194
Last Week
1
Last month
Citations as of Apr 21, 2024

Downloads

251
Citations as of Apr 21, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.