Title: Factors affecting schedule delay, cost overrun, and quality level in public construction projects
Authors: Larsen, JK
Shen, GQP 
Lindhard, SM
Brunoe, TD
Issue Date: Jan-2016
Source: Journal of management in engineering, Jan. 2016, v. 32, no. 1, 4015032, p.1-10
Abstract: As a result of the loss of financial resources and the need to optimize projects, academics, politicians, and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality of construction projects. The purpose of this study was to analyze the factors that project managers experience as having the greatest effect on time, cost, and quality, and to discover whether the effects of these factors are significantly different from each other. A questionnaire with 26 factors identified from interviews was sent to the full population of publicly employed project managers. Factors were ranked using the relative importance index and tested for significant differences using Friedman's test. Wilcoxon's test was used in a post-hoc analysis. From the findings it was determined that the most influential factor for time is unsettled or lack of project funding; for cost, errors or omissions in consultant material; and for quality, errors or omissions in construction work. The main conclusion of this research is that project schedule, budget, and quality level are affected in significantly different ways. Therefore, a project manager cannot handle such critical issues by focusing only on schedule or budget complications; nor can he or she assume that time, cost, and quality are equally affected.
Keywords: Construction management
Cost overrun
Denmark
Quality level
Schedule delay
Publisher: American Society of Civil Engineers
Journal: Journal of management in engineering 
ISSN: 0742-597X
EISSN: 1943-5479
DOI: 10.1061/(ASCE)ME.1943-5479.0000391
Rights: © 2015 American Society of Civil Engineers
The following publication Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2015). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of management in engineering, 32(1), 04015032 is available at http://dx.doi.org/10.1061/(ASCE)ME.1943-5479.0000391
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Larsen_Jesper_Kranker_2015.pdfPre-Published version830.3 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

1,199
Last Week
21
Last month
Citations as of Apr 21, 2024

Downloads

6,217
Citations as of Apr 21, 2024

SCOPUSTM   
Citations

247
Last Week
0
Last month
Citations as of Apr 19, 2024

WEB OF SCIENCETM
Citations

184
Last Week
1
Last month
Citations as of Apr 25, 2024

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.