Title: Factors affecting schedule delay, cost overrun, and quality level in public construction projects
Authors: Larsen, JK
Shen, GQP 
Lindhard, SM
Brunoe, TD
Keywords: Construction management
Cost overrun
Quality level
Schedule delay
Issue Date: Jan-2016
Publisher: American Society of Civil Engineers
Source: Journal of management in engineering, Jan. 2016, v. 32, no. 1, 4015032, p.1-10 How to cite?
Journal: Journal of management in engineering 
Abstract: As a result of the loss of financial resources and the need to optimize projects, academics, politicians, and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality of construction projects. The purpose of this study was to analyze the factors that project managers experience as having the greatest effect on time, cost, and quality, and to discover whether the effects of these factors are significantly different from each other. A questionnaire with 26 factors identified from interviews was sent to the full population of publicly employed project managers. Factors were ranked using the relative importance index and tested for significant differences using Friedman's test. Wilcoxon's test was used in a post-hoc analysis. From the findings it was determined that the most influential factor for time is unsettled or lack of project funding; for cost, errors or omissions in consultant material; and for quality, errors or omissions in construction work. The main conclusion of this research is that project schedule, budget, and quality level are affected in significantly different ways. Therefore, a project manager cannot handle such critical issues by focusing only on schedule or budget complications; nor can he or she assume that time, cost, and quality are equally affected.
ISSN: 0742-597X
EISSN: 1943-5479
DOI: 10.1061/(ASCE)ME.1943-5479.0000391
Rights: © 2015 American Society of Civil Engineers
The following publication Larsen, J. K., Shen, G. Q., Lindhard, S. M., & Brunoe, T. D. (2015). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of management in engineering, 32(1), 04015032 is available at
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Larsen_Jesper_Kranker_2015.pdfPre-Published version830.3 kBAdobe PDFView/Open
View full-text via PolyU eLinks SFX Query
Show full item record


Last Week
Last month
Citations as of Mar 15, 2018


Last Week
Last month
Citations as of Mar 18, 2018

Page view(s)

Last Week
Last month
Citations as of Mar 19, 2018


Citations as of Mar 19, 2018

Google ScholarTM



Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.