Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/60315
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Electrical Engineering-
dc.creatorWang, KW-
dc.creatorLiu, XG-
dc.creatorTse, CT-
dc.creatorHu, JL-
dc.date.accessioned2016-11-21T02:36:36Z-
dc.date.available2016-11-21T02:36:36Z-
dc.identifier.issn1671-6833-
dc.identifier.urihttp://hdl.handle.net/10397/60315-
dc.language.isozhen_US
dc.publisher郑州大学en_US
dc.rights© 2004 中国学术期刊电子杂志出版社。本内容的使用仅限于教育、科研之目的。en_US
dc.rights© 2004 China Academic Journal Electronic Publishing House. It is to be used strictly for educational and research purposes.en_US
dc.subjectUrban power systemen_US
dc.subjectOn-lineen_US
dc.subjectOptimizationen_US
dc.subjectEnumeration approachen_US
dc.titleOn-line optimization of the operating configuration for urban high-voltage systemen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage59-
dc.identifier.epage62-
dc.identifier.volume25-
dc.identifier.issue2-
dcterms.abstract从城市高压电网的实际特点出发,采用降阶枚举法进行城市高压电网最优运行网架的在线确定计算.开关的状态用整型变量表达,所有开关状态的组合构成了电网可能运行方式的全枚举集;考虑继电保护等各种实际电网运行约束后,大幅度减少了可能的运行方式数;对有限数目运行方式的准确计算,保证了结果的最优性和计算的快速性.该思路已分别用于"城市电网智能决策支持系统"中电网事故后恢复方案、当前运行方式以及将来任一时刻的最优网架运行方案的确定.在南阳城市电网的实际试运行表明了该方法的有效性和实用性.-
dcterms.abstractBased on the characteristics of the urban high_voltage power system, the reduced order enumeration approach is applied to on_line determination of the optimum operating mode for urban power network configuration. The operating states of breaks are represented by integer variables, the combination of all break states forms the full enumeration set. With the consideration of various practical constraints, such as the relay protection constraints, the number of system operating mode is largely reduced. Therefore, the optimum result and the computational speed is obtained by the accurate computation for only limited number of system modes. In the "intelligent supporting system for urban power systems", this approach has been used, respectively, for the restore scheme determination after a system fault, the current system mode optimization, and any future system condition analysis. The effectiveness of the discussed approach is tested by the application in the Nanyang urban power system. 还原-
dcterms.accessRightsopen accessen_US
dcterms.alternative城市高压电网最优网架运行方式的在线确定-
dcterms.bibliographicCitation郑州大学学报. 工学版 (Journal of Zhengzhou University. Engineering science), June 2004, v. 25, no. 2, p. 59-62-
dcterms.isPartOf郑州大学学报. 工学版 (Journal of Zhengzhou University. Engineering science)-
dcterms.issued2004-
dc.identifier.rosgroupidr16819-
dc.description.ros2003-2004 > Academic research: refereed > Publication in refereed journal-
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
r16819.pdf149.2 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

292
Last Week
0
Last month
Citations as of Apr 21, 2024

Downloads

55
Citations as of Apr 21, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.