Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/60266
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Electrical Engineering-
dc.creatorZhao, XS-
dc.creatorYu, CW-
dc.creatorChung, CY-
dc.creatorWen, FS-
dc.creatorChung, TS-
dc.creatorHuang, MX-
dc.date.accessioned2016-11-21T02:36:28Z-
dc.date.available2016-11-21T02:36:28Z-
dc.identifier.issn1000-1026-
dc.identifier.urihttp://hdl.handle.net/10397/60266-
dc.language.isozhen_US
dc.publisher電力工業部南京自動化硏究所en_US
dc.rights© 2003 中国学术期刊电子杂志出版社。本内容的使用仅限于教育、科研之目的。en_US
dc.rights© 2003 China Academic Journal Electronic Publishing House. It is to be used strictly for educational and research purposes.en_US
dc.subjectElectricity marketen_US
dc.subjectAncillary servicesen_US
dc.subjectOperating reserveen_US
dc.subjectPricing mechanismen_US
dc.subjectProcurement of reserve capacityen_US
dc.subjectPeak load pricingen_US
dc.titleProcurement and pricing of operating reserves based on the Peak-Load Pricing Theoryen_US
dc.typeJournal/Magazine Articleen_US
dc.identifier.spage24-
dc.identifier.epage28, 55-
dc.identifier.volume27-
dc.identifier.issue2-
dcterms.abstract在以“厂网分开、竞价上网”为主要特征的电力市场环境下 ,如何在兼顾经济性和运行可靠性的前提下获取适当的运行备用容量以及如何确定其价格成为十分重要的问题。文中对传统的高峰负荷定价理论在电力工业中的应用进行了扩展 ,提出了一种新的运行备用定价机制。该定价机制与现行的市场运营模式相适应 ,在假设电力市场运营机构能够准确评估事故成本和发电公司自愿申报其提供备用容量的真实成本的前提下 ,可以获得兼顾电力市场运营经济性和运行可靠性的最优运行备用的获取和定价方案 ,并为市场参与者提供有用的价格和可靠性信息-
dcterms.abstractPower industry restructuring presents new challenges for procuring and pricing of operating reserves. Efficient procurement and optimum pricing of operating reserves are important issues to be dealt with in competitive electricity markets. A pricing scheme for operating reserves, which is based on the extended traditional peak load pricing theory and is compatible with auction based dispatching in the electricity market environment, is proposed in this paper. Under assumptions that accurate system outage cost is known and reserve capacity price bids by generation companies are consistent with their true costs, both economic operation and system reliability can be simultaneously taken into account in the proposed scheme. It provides useful information to the market participants on the cost and reliability.-
dcterms.accessRightsopen accessen_US
dcterms.alternative基于高峰负荷定价理论的运行备用获取和定价-
dcterms.bibliographicCitation电力系统自动化 (Automation of electric power systems), Jan. 2003, v. 27, no. 2, p. 24-28, 55-
dcterms.isPartOf电力系统自动化 (Automation of electric power systems)-
dcterms.issued2003-
dc.identifier.rosgroupidr13763-
dc.description.ros2002-2003 > Academic research: refereed > Publication in refereed journal-
dc.description.oaVersion of Recorden_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
r13763.pdf225.99 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

234
Last Week
2
Last month
Citations as of May 5, 2024

Downloads

110
Citations as of May 5, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.