Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/4629
PIRA download icon_1.1View/Download Full Text
DC FieldValueLanguage
dc.contributorDepartment of Building and Real Estate-
dc.creatorChan, HL-
dc.creatorChan, DWM-
dc.creatorLord, W-
dc.date.accessioned2014-12-11T08:28:22Z-
dc.date.available2014-12-11T08:28:22Z-
dc.identifier.issn0267-2359-
dc.identifier.urihttp://hdl.handle.net/10397/4629-
dc.language.isoenen_US
dc.publisherSweet & Maxwellen_US
dc.rightsConstruction Law Journal © 2011 Sweet & Maxwell and its Contributorsen_US
dc.subjectComparative lawen_US
dc.subjectConstruction contractsen_US
dc.subjectHong Kongen_US
dc.subjectRisken_US
dc.subjectTarget cost contractsen_US
dc.titleKey risk factors and risk mitigation measures for target cost contracts in construction - a comparison between the West and the Easten_US
dc.typeJournal/Magazine Articleen_US
dc.description.otherinformationAuthor name used in this manuscript: Wayne E. Lorden_US
dc.description.otherinformationAuthor name used in this manuscript: Joseph H.L. Chanen_US
dc.identifier.spage441-
dc.identifier.epage458-
dc.identifier.volume27-
dc.identifier.issue6-
dcterms.abstractThis article is an extension of a research article published in the July 2010 issue of the Construction Law Journal in which the findings of seven face-to-face structured interviews, conducted in Hong Kong, on the perceptions of key risk factors and risk mitigation measures for Guaranteed Maximum Price (GMP) contracts and Target Cost Contracts (TCC) were reported. Further to this previous research undertaken in Hong Kong, five similar in-depth structured interviews were conducted in the United Kingdom. The interviewees perceived the change in scope of work, quality and clarity of tender documents, selection of competent subcontractors and unforeseen ground conditions as key risk factors encountered in GMP/TCC construction projects. They also considered a basket of measures including: the adjudication of bids in risk assessment; total reflection on potential risks in tender documents; use of risk registers; and development of a proper risk management process, as being effective in risk mitigation. The UK findings were compared and contrasted with those from Hong Kong. It was found that the key risk factors associated with GMP/TCC contracts between the two jurisdictions *Const. L.J. 442 are similar by nature in general. However, differences in perceptions on risk mitigation measures are also observed, which may be due to the disparities in the implementation of GMP/TCC methodology between the two regions.-
dcterms.accessRightsopen accessen_US
dcterms.bibliographicCitationConstruction law journal, Sept. 2011, v. 27, no. 6, p. 441-458-
dcterms.isPartOfConstruction law journal-
dcterms.issued2011-09-
dc.identifier.rosgroupidr56808-
dc.description.ros2011-2012 > Academic research: refereed > Publication in refereed journal-
dc.description.oaAccepted Manuscripten_US
dc.identifier.FolderNumberOA_IR/PIRAen_US
dc.description.pubStatusPublisheden_US
Appears in Collections:Journal/Magazine Article
Files in This Item:
File Description SizeFormat 
PolyU IR Submission 2011_CLJ_1.pdfPre-published version184.76 kBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show simple item record

Page views

351
Last Week
0
Last month
Citations as of Apr 21, 2024

Downloads

775
Citations as of Apr 21, 2024

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.