Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/111892
PIRA download icon_1.1View/Download Full Text
Title: The organizational mechanism of new technology implementation: an empirical study in the Chinese construction industry
Authors: Li, T
Helian, Z
Jin, X 
Issue Date: 2024
Source: Journal of Asian architecture and building engineering, Published online: 09 Jul 2024, Latest Articles, p. 1-12, https://doi.org/10.1080/13467581.2024.2378006
Abstract: In the past decade or so, an increasing number of construction organizations have shifted from traditional CAD to BIM, which requires organizations to make corresponding changes and can be seen as a progressive organizational change. However, existing research knows little about the organizational management mechanisms for BIM implementation. From the perspective of organizational change, considering the role of transformational leadership and organizational unlearning, this study constructs a framework to explore the organizational mechanism of BIM implementation. Based on empirical analysis of 124 samples from mainland China, it was found that transformational leadership contributes to the improvement of an organization’s BIM implementation level and the pathway is mainly achieved through organizational unlearning. This study contributes to the construction industry’s organizational change and new technology implementation by inferring and validating the positive roles of transformational leadership and organizational unlearning in promoting BIM implementation. Research findings can also provide helpful guidance for industry participants to implement BIM within organizations successfully.
Keywords: Building information modeling (BIM)
New technology implementation
Organizational change
Organizational unlearning
Transformational leadership
Publisher: Architectural Institute of Japan
Journal: Journal of Asian architecture and building engineering 
ISSN: 1346-7581
EISSN: 1347-2852
Rights: © 2024 The Author(s). Published by Informa UK Limited, trading as Taylor & Francis Group on behalf of the Architectural Institute of Japan, Architectural Institute of Korea andArchitectural Society of China.This is an Open Access article distributed under the terms of the Creative Commons Attribution-NonCommercial License (http://creativecommons.org/licenses/by-nc/4.0/), whichpermits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited. The terms on which this article has beenpublished allow the posting of the Accepted Manuscript in a repository by the author(s) or with their consent.
The following publication Li, T., Helian, Z., & Jin, X. (2024). The organizational mechanism of new technology implementation: an empirical study in the Chinese construction industry. Journal of Asian Architecture and Building Engineering, 1–12 is available at https://doi.org/10.1080/13467581.2024.2378006.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Li_Organizational_Mechanism_New.pdf1.47 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Version of Record
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

3
Citations as of Apr 14, 2025

Downloads

1
Citations as of Apr 14, 2025

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.