| Title: | Modeling stakeholder-associated productivity performance risks in modular integrated construction projects of Hong Kong : a social network analysis | Authors: | Zhou, JX Huang, L Shen, GQ Wu, H Luo, L |
Issue Date: | 15-Oct-2023 | Source: | Journal of cleaner production, 15 Oct. 2023, v. 423, 138699 | Abstract: | Modular integrated construction (MiC) has received remarkable attention for enhancing the productivity performance of delivering housing projects in densely populated cities such as Hong Kong. MiC projects suffer from unique risk factors compared with traditional construction methods. Previous studies have mainly focused on the direct linear impacts of risk factors and how they may affect project success. However, the MiC supply chain involves many stakeholders with high interdependency. How the risks are interconnected and interact with different stakeholders is a crucial issue to be analyzed and addressed. This paper deploys a social network analysis (SNA) method to identify and decipher stakeholder-associated productivity performance risks (PPRs) and their interrelations in an MiC project in Hong Kong. Fifteen critical PPRs and twelve essential interactions were demonstrated by simulating the complex network of the target project. Research findings show that inadequate project planning and scheduling has the greatest influence on collaborative decision-making support; Delayed assembly schedule and delayed delivery of modules also exert considerable influence on project planning and scheduling; The main contractor plays a leading role as a coordinator in the whole MiC process. The research further identifies several primary challenges, including the inefficient data capture approach, insufficient supply chain planning and progress monitoring, poor communication and information interchange among project stakeholders, and lack of collaborative decision-making support. This is the first study that dynamically examines and demystifies stakeholder-associated PPRs embedded in MiC projects in Hong Kong on a network basis, which could assist researchers and construction professionals in perceiving, investigating, addressing, and mitigating these risks in an effective and efficient approach. | Keywords: | Modular integrated construction (MiC) Productivity performance risks (PPRs) Social network analysis (SNA) Stakeholder interrelations |
Publisher: | Elsevier | Journal: | Journal of cleaner production | ISSN: | 0959-6526 | DOI: | 10.1016/j.jclepro.2023.138699 | Rights: | © 2023 Elsevier Ltd. All rights reserved. © 2023. This manuscript version is made available under the CC-BY-NC-ND 4.0 license https://creativecommons.org/licenses/by-nc-nd/4.0/ The following publication Zhou, J. X., Huang, L., Shen, G. Q., Wu, H., & Luo, L. (2023). Modeling stakeholder-associated productivity performance risks in modular integrated construction projects of Hong Kong: A social network analysis. Journal of Cleaner Production, 423, 138699 is available at https://doi.org/10.1016/j.jclepro.2023.138699. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Zhou_Modeling_Stakeholder-associated_Productivity.pdf | Pre-Published version | 1.52 MB | Adobe PDF | View/Open |
Page views
109
Citations as of Nov 10, 2025
SCOPUSTM
Citations
18
Citations as of Dec 5, 2025
WEB OF SCIENCETM
Citations
14
Citations as of Dec 4, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.