Title: A heuristic rule adaptive selection approach for multi-work package project scheduling problem
Authors: Zhang, Y 
Li, X
Teng, Y 
Shen, GQ 
Bai, S
Issue Date: 15-Mar-2024
Source: Expert systems with applications, 15 Mar. 2024, v. 238, part D, 122092
Abstract: Effectively scheduling a project is crucial for its success, especially after generating work packages from the work breakdown structure during the planning phase. Nevertheless, solving project scheduling problems with multiple work packages is challenging due to the inefficient utilization of work package information in existing scheduling approaches. To address this issue, this paper proposes the Heuristic Rule Adaptive Selection (HAS) approach for the Multi-Work Package Project Scheduling Problem (MWPSP). This approach involves work package information and employs reinforcement learning (RL) for intelligent decision-making in scheduling. First, the MWPSP with the optimization objective of minimizing the Portfolio Delay (PDEL) and the Average Percent Delay (APD) is defined, and a scheduling environment is established that integrates information from both work packages and tasks. Second, a Double Deep Q-network (DDQN) is employed to train agents for adaptively selecting heuristic rules of tasks and work packages. The performance of the HAS approach is then evaluated using a case project and the newly created MWPSP dataset. The experimental results demonstrate that the HAS approach exhibits superior solution quality and computational efficiency in optimizing PDEL and APD compared to heuristics approaches, e.g., single-priority rule-based heuristics and genetic algorithms. This achievement sets the stage for the development of next-generation adaptive scheduling for construction projects.
Keywords: Adaptive scheduling
Deep Q-network
Multi-work package project scheduling problem
Reinforcement learning
Publisher: Pergamon Press
Journal: Expert systems with applications 
ISSN: 0957-4174
EISSN: 1873-6793
DOI: 10.1016/j.eswa.2023.122092
Research Data: https://www.sciencedirect.com/science/article/pii/S0957417423025940?via%3Dihub#da005
Rights: © 2023 Elsevier Ltd. All rights reserved.
© 2023. This manuscript version is made available under the CC-BY-NC-ND 4.0 license https://creativecommons.org/licenses/by-nc-nd/4.0/
The following publication Zhang, Y., Li, X., Teng, Y., Shen, G. Q., & Bai, S. (2024). A heuristic rule adaptive selection approach for multi-work package project scheduling problem. Expert Systems with Applications, 238, 122092 is available at https://doi.org/10.1016/j.eswa.2023.122092.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Zhang_Heuristic_Rule_Adaptive.pdfPre-Published version3.09 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

215
Citations as of Feb 9, 2026

SCOPUSTM   
Citations

17
Citations as of Apr 3, 2026

WEB OF SCIENCETM
Citations

8
Citations as of Apr 24, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.