Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/104275
PIRA download icon_1.1View/Download Full Text
Title: Construction and demolition waste management in China through the 3R principle
Authors: Huang, B
Wang, X
Kua, H
Geng, Y
Bleischwitz, R
Ren, J 
Issue Date: Feb-2018
Source: Resources, conservation and recycling, Feb. 2018, v. 129, p. 36-44
Abstract: Construction and demolition waste (CDW) accounts for 30% to 40% of the total amount of waste in China. CDW is usually randomly dumped or disposed in landfills and the average recycling rate of CDW in China is only about 5%. Considering there is big challenge in adoption of circular economy in CDW industry in China while related research is still limited, we conduct the CDW management analysis through 3R principle. Existing policies and management situations were investigated and analyzed based on the reduction, reuse and recycle principles. Results reveal that primary barriers of reducing CDW in China include lack of building design standard for reducing CDW, low cost for CDW disposal and inappropriate urban planning. Barriers to reuse CDW include lack of guidance for effective CDW collection and sorting, lack of knowledge and standard for reused CDW, and an under-developed market for reused CDW. As for recycling of CDW, key challenges are identified as ineffective management system, immature recycling technology, under-developed market for recycled CDW products and immature recycling market operation. Proposals to improve the current situation based on 3R principle are also proposed, including designing effective circular economy model, reinforcing the source control of CDW, adopting innovative technologies and market models, and implementing targeted economic incentives.
Keywords: China
Circular economy
Construction and demolition waste
Management
Publisher: Elsevier BV
Journal: Resources, conservation and recycling 
ISSN: 0921-3449
EISSN: 1879-0658
DOI: 10.1016/j.resconrec.2017.09.029
Rights: © 2017 Published by Elsevier B.V.
© 2017. This manuscript version is made available under the CC-BY-NC-ND 4.0 license https://creativecommons.org/licenses/by-nc-nd/4.0/
The following publication Huang, B., Wang, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J. (2018). Construction and demolition waste management in China through the 3R principle. Resources, Conservation and Recycling, 129, 36–44 is available at https://doi.org/10.1016/j.resconrec.2017.09.029.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Ren_Construction_Demolition_Waste.pdfPre-Published version1.4 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

124
Last Week
7
Last month
Citations as of Nov 30, 2025

Downloads

520
Citations as of Nov 30, 2025

SCOPUSTM   
Citations

873
Citations as of Dec 19, 2025

WEB OF SCIENCETM
Citations

734
Citations as of Dec 18, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.