Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/103279
| Title: | Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects : a Bayesian-network-based model | Authors: | Yu, T Man, Q Wang, Y Shen, GQ Hong, J Zhang, J Zhong, J |
Issue Date: | 20-Dec-2019 | Source: | Journal of cleaner production, 20 Dec. 2019, v. 241, 118390 | Abstract: | Offsite construction has been identified as an effective approach for enhancing the sustainability of the construction industry. However, due to the fragmented production processes of offsite construction, quality defect control has become a significant challenge in the promotion of offsite construction projects. Offsite construction projects involve multiple interdependent stakeholders in close collaboration. These stakeholders play various roles in quality management and have different degrees of impact on the occurrence of quality defects. To enhance quality defect management in offsite construction projects, it is important to evaluate the different stakeholder impacts on the occurrence of quality defect. Through impact evaluations, critical stakeholders can be identified and their responsibilities clarified with respect to project quality, thereby motivating these key stakeholders to improve their quality defect control. In this study, we developed an evaluation model using the Bayesian network approach to measure stakeholder impacts on defect occurrence in offsite construction projects. Quality defects and stakeholder-related factors that might incur defects were modeled as a Bayesian network and the dependencies among network nodes examined. Then, the stakeholder impacts on the occurrence of quality defects were evaluated using Bayesian analysis. Finally, this Bayesian-network-based evaluation model was applied to a real project in Shenzhen, China. The results indicate that use of precast components with quality defects, misoperations by construction workers, and ineffective quality inspection and testing during onsite assembly and construction were the major factors affecting quality defect control. Additionally, in this case study, we found the contractor to have the highest level of impact on the occurrence of quality defects. This study contributes to the fields of stakeholder impact evaluation and quality defect analysis, and links defect management with key project stakeholders. | Keywords: | Bayesian network Offsite construction project Quality defect Stakeholder impact |
Publisher: | Elsevier BV | Journal: | Journal of cleaner production | ISSN: | 0959-6526 | DOI: | 10.1016/j.jclepro.2019.118390 | Rights: | © 2019 Elsevier Ltd. All rights reserved. © 2019. This manuscript version is made available under the CC-BY-NC-ND 4.0 license https://creativecommons.org/licenses/by-nc-nd/4.0/ The following publication Yu, T., Man, Q., Wang, Y., Shen, G. Q., Hong, J., Zhang, J., & Zhong, J. (2019). Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects: A Bayesian-network-based model. Journal of Cleaner Production, 241, 118390 is available at https://doi.org/10.1016/j.jclepro.2019.118390. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Shen_Evaluating_Different_Stakeholder.pdf | Pre-Published version | 1.54 MB | Adobe PDF | View/Open |
Page views
114
Last Week
5
5
Last month
Citations as of Nov 30, 2025
Downloads
208
Citations as of Nov 30, 2025
SCOPUSTM
Citations
87
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
69
Citations as of Dec 18, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



