Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/103229
PIRA download icon_1.1View/Download Full Text
Title: Supply chain management for prefabricated building projects in Hong Kong
Authors: Luo, L 
Jin, X 
Shen, GQ 
Wang, Y
Liang, X
Li, X 
Li, CZ
Issue Date: Mar-2020
Source: Journal of management in engineering, Mar. 2020, v. 36, no. 2, 05020001, p. 1-15
Abstract: Prefabricated building projects (PBPs) have gained worldwide popularity over the past few decades because of their various benefits. Supply chain management (SCM) is critical to the successful delivery of PBPs because supply chains are complex, involving multiple processes and stakeholders. Poor SCM in PBPs causes cost overruns and schedule delays. This study investigates production, transportation, and assembly in a PBP in Hong Kong to quantitatively analyze and critique its SCM. Automated data collection technologies were adopted to obtain real-time information on precast components throughout the supply chain. Findings from the study show that limited consideration of resource planning, significant assembly delay, overproduction, excess inventory, and long lead times are severe problems. The root causes of these problems include poor supply chain planning, poor communication between stakeholders, and poor workflow control. This study objectively reveals the true picture of SCM for PBPs using real-time information on an entire supply chain. The results provide an in-depth understanding of SCM in PBPs, which will be of great value to stakeholders in improving PBP supply chain performance.
Keywords: Empirical analysis
Precast components
Prefabricated building projects
Real-time information
Supply chain management
Publisher: American Society of Civil Engineers
Journal: Journal of management in engineering 
ISSN: 0742-597X
EISSN: 1943-5479
DOI: 10.1061/(ASCE)ME.1943-5479.0000739
Rights: © 2020 American Society of Civil Engineers.
This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://doi.org/10.1061/(ASCE)ME.1943-5479.0000739.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Jin_Supply_Chain_Management.pdfPre-Published version1.11 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

120
Last Week
1
Last month
Citations as of Nov 30, 2025

Downloads

300
Citations as of Nov 30, 2025

SCOPUSTM   
Citations

125
Citations as of Dec 19, 2025

WEB OF SCIENCETM
Citations

105
Citations as of Dec 18, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.