Please use this identifier to cite or link to this item: http://hdl.handle.net/10397/103214
PIRA download icon_1.1View/Download Full Text
Title: Influence of formal and informal stakeholder relationship on megaproject performance : a case of China
Authors: Xue, J 
Shen, GQ 
Yang, RJ
Zafar, I 
Ekanayake, EMAC 
Lin, X
Darko, A 
Issue Date: 22-Jul-2020
Source: Engineering, construction and architectural management, 22 July 2020, v. 27, no. 7, p. 1505-1531
Abstract: Purpose: The purpose of this research is to seek better relational strategies between formal and informal stakeholder relationships to improve megaproject performance.
Design/methodology/approach: The conceptual model was developed with twenty hypotheses based on the literature review. Then a questionnaire survey was conducted, and the collected data were analyzed by Partial Least squares Structural Equation Modeling (PLS-SEM) for validating the proposed model. Finally, the findings were discussed by a comparative study to explain the different effects of the formal and informal relationship on megaproject performance, and the managerial implications are presented for the stakeholders to implement the relationship management in the megaprojects.
Findings: The research finding reveals that formal relationship plays a dominating role in cost, quality, and labor protection; meanwhile, it is still more reliable in improving coordination, safety and environmental protection. Both formal and informal relationship is equally important towards collaboration and scheduling while the informal relationship is more effective in communication and project transparency.
Originality/value: The study extends the knowledge of relationship management in the domain of the megaproject performance. It provides a comprehensive and systematic understanding of the impact of formal and informal stakeholder relationships on ten aspects of the megaproject performance by the proposed conceptual model and PLS-SEM results. The research findings contribute to the theory of relationship management on how the different influences between formal and informal stakeholder relationships lead to better megaproject performance from inter-organizational level to project and societal level.
Keywords: Formal relationship
Informal relationship
Megaproject performance
Stakeholder relationship
Publisher: Emerald Publishing Limited
Journal: Engineering, construction and architectural management 
ISSN: 0969-9988
EISSN: 1365-232X
DOI: 10.1108/ECAM-07-2019-0353
Rights: © Emerald Publishing Limited. This AAM is provided for your own personal use only. It may not be used for resale, reprinting, systematic distribution, emailing, or for any other commercial purpose without the permission of the publisher.
The following publication Xue, J., Shen, G.Q., Yang, R.J., Zafar, I., Ekanayake, E.M.A.C., Lin, X. and Darko, A. (2020), "Influence of formal and informal stakeholder relationship on megaproject performance: a case of China", Engineering, Construction and Architectural Management, Vol. 27 No. 7, pp. 1505-1531 is published by Emerald and is available at https://doi.org/10.1108/ECAM-07-2019-0353.
Appears in Collections:Journal/Magazine Article

Files in This Item:
File Description SizeFormat 
Xue_Influence_Formal_Informal.pdfPre-Published version4.3 MBAdobe PDFView/Open
Open Access Information
Status open access
File Version Final Accepted Manuscript
Access
View full-text via PolyU eLinks SFX Query
Show full item record

Page views

105
Last Week
2
Last month
Citations as of Nov 30, 2025

Downloads

232
Citations as of Nov 30, 2025

SCOPUSTM   
Citations

42
Citations as of Dec 19, 2025

WEB OF SCIENCETM
Citations

41
Citations as of Dec 18, 2025

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.