Please use this identifier to cite or link to this item:
http://hdl.handle.net/10397/102510
| Title: | Accelerated construction of self-anchored suspension bridge using novel tower-girder anchorage technique | Authors: | Wang, X Fei, P Dong, Y Wang, C |
Issue Date: | May-2019 | Source: | Journal of bridge engineering, May 2019, v. 24, no. 5, 05019006 | Abstract: | The traditional construction methods (e.g., erecting cable after girder) of the self-anchored suspension bridge can interrupt traffic during the construction stage due to the installation of temporary supports. That severely limits the wide application of this type of bridge. Thus, this study proposes a novel tower-girder anchorage (TGA) technique for accelerated construction of self-anchored suspension bridges. By using the proposed TGA technique, the midspan girder segments are hoisted and connected to the hangers, which subsequently avoids the interruption of traffic during the construction period. The proposed TGA technique would reduce the construction cost, time of erection, and demolition of temporary scaffolds. To ensure structural safety and performance during the proposed construction process, the force transfer mechanism and construction process of the TGA technique are assessed. To this end, the devices for the TGA technique and system transformation are designed. The constructability of the TGA technique on accelerated bridge construction is evaluated by a real-world application: Dongtiao River Bridge in China. A finite-element model is established to analyze the construction process. Simulation analysis and field test data are compared. The comparison demonstrates that the TGA technique can safely and economically achieve accelerated construction of self-anchored suspension bridges. | Keywords: | Accelerated construction Self-anchored suspension bridge System transformation Tower-girder anchorage |
Publisher: | American Society of Civil Engineers | Journal: | Journal of bridge engineering | ISSN: | 1084-0702 | EISSN: | 1943-5592 | DOI: | 10.1061/(ASCE)BE.1943-5592.0001383 | Rights: | © 2019 American Society of Civil Engineers. This material may be downloaded for personal use only. Any other use requires prior permission of the American Society of Civil Engineers. This material may be found at https://ascelibrary.org/doi/10.1061/(ASCE)BE.1943-5592.0001383. |
| Appears in Collections: | Journal/Magazine Article |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| Dong_Accelerated_Construction_Self-Anchored.pdf | Pre-Published version | 1.27 MB | Adobe PDF | View/Open |
Page views
128
Last Week
4
4
Last month
Citations as of Nov 9, 2025
Downloads
118
Citations as of Nov 9, 2025
SCOPUSTM
Citations
19
Citations as of Dec 19, 2025
WEB OF SCIENCETM
Citations
19
Citations as of Dec 18, 2025
Google ScholarTM
Check
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.



