Title: Post-contract material management and waste minimization : an analysis of the roles of quantity surveyors
Authors: Saka, AB 
Olaore, FO
Olawumi, TO 
Keywords: Construction project management
Waste minimization
Material management
Post-contract
Quantity surveyors
Issue Date: 5-Aug-2019
Publisher: Emerald Group Publishing Limited
Source: Journal of engineering, design and technology, 5 Aug. 2019, v. 17, no. 4, p. 793-807 How to cite?
Journal: Journal of engineering, design and technology 
Abstract: Purpose - This paper aims to assess the level of awareness of quantity surveyors in material management and their key roles in waste minimization during the post-contract stage of the project with a view of achieving value for money in their roles.
Design/methodology/approach - This involves administering a questionnaire survey to registered members of the Nigerian Institute of Quantity Surveyors, the only recognized professional body of quantity surveyors in Nigeria, within Lagos state. The empirical questionnaire survey succeeds a literature review that isolates the key strategies used by quantity surveyors in material management and waste minimization at the post-contract stage. The validity of the questionnaire was carried out by two experienced construction industry researchers and three experienced professional quantity surveyors to ensure that the questionnaire was not ambiguous and that it consists of the right questions in tandem with the research. The respondents were grouped into consultant's QS and contractor's QS.
Findings - Key roles of quantity surveyors during the material management process are proper material storage, and material inventory and accounting are the most important material management and waste minimization practices during the institute stage. It revealed that there is a lack of material waste documentation practices during the construction stage. In addition, there is no statistically significant difference in the responses of the two groups. This may be because there is no clear compartmentalization between the practices of the two groups. In addition, these two groups had the same education training, as there is no difference between the educational training of the consultant's QS and contractor's QS.
Originality/value - This study assessed the quantity surveyors' roles with regard to material management and waste minimization. It would add to the scanty research work in this area. The study has also successfully revealed the strategies that are to be adopted by the quantity surveyors to achieve value for money during the post-contract stage.
URI: http://hdl.handle.net/10397/81577
ISSN: 1726-0531
EISSN: 1758-8901
DOI: 10.1108/JEDT-10-2018-0193
Appears in Collections:Journal/Magazine Article

Access
View full-text via PolyU eLinks SFX Query
Show full item record

SCOPUSTM   
Citations

2
Citations as of Jan 12, 2020

WEB OF SCIENCETM
Citations

2
Citations as of Jan 19, 2020

Page view(s)

138
Citations as of Jan 22, 2020

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.